JOB SPECIFIC SPECIFICATIONS:

n

Weight of scoreboard system load

n

Vertical lift required

n

Hook blocks as required for reeving

n

Vertical reach if required

n

Quantity and type of elevation detection

n

Number of remote pendents

n

Pickup points to scoreboard

n

Type of mounting

n

Hook centers

n

Voltage

n

Tentative installation start and completion date

n

Mounting drawings required from hoist supplier for customer engineers approval

n

Hoist weight certification required

n

Hoist to include interface steel/fasteners required for mounting to structure

CERTIFICATION/DOCUMENTATION REQUIRED FROM HOIST MANUFACTURER:

n

Signed

 

certification by PE/Company CEO that the design meets the specifications for this application.

n

Auxiliary fail-protection overspeed braking system to have been installed and functionaly on at least two

installations for a period of one year, or be field testable for functionality.

n

Installation to include operator training and signed receipt of those trained.

n

Recommended inspection schedule.

n

Calculations for hoist design must be available on demand with PE signature.

n

Certificate of Conformance to metallurgical, drawing and general manufacturing processes of the gear drive

manufacturer. Document must originate from the gear drive manufacturer.

n

Calculations on maximum transitional load to structure if overspeed brakes where activated.

NOTE:

These specifications are subject to change without notice. Please contact Daktronics for the most

current revision of this document.

®

Daktronics, Inc.

P.O. Box 5128    331 32nd Avenue   Brookings, SD 57006
Phone (605) 697-4300  or  (888) 325-8766  Fax 697-4700
www.daktronics.com      e-mail  [email protected]

Page 2 of 2
Copyright © 1999-2001 Daktronics, Inc.  SL011801-3610

SCOREBOARD  HOIST/SUSPENSION

SYSTEM SPECIFICATIONS

Summary of Contents for H-2024-9

Page 1: ...duced or copied in any form or by any means graphic electronic or mechanical including photocopying taping or information storage and retrieval systems without written permission of the publisher Four...

Page 2: ......

Page 3: ...el on the Message Center 2 5 Connecting Power and Signal Between Sections 2 5 Attaching Corner Shrouds 2 6 Attaching Suspension Cables 2 6 2 3 Power 2 7 2 4 Grounding 2 7 2 5 Signal 2 8 Section 3 Main...

Page 4: ......

Page 5: ...referenced by their last set of digits and the letter preceding them In Figure 1 the drawing would be referred to as Drawing A 69945 Drawings are grouped and inserted in alphanumerical order in the Ap...

Page 6: ...ics four sided hockey LED scoreboards are part of a family of scoreboard systems designed to offer simple installation easy readability and reliability Microprocessor control assures consistent operat...

Page 7: ...hich the scoreboard is to be suspended must be determined at the time of purchase There are two primary methods of installing a center hung scoreboard creating a static hung system or using a hoist Ea...

Page 8: ...Hook up power and signal to outlets and junction boxes in the ceiling 5 Level the scoreboard by adjusting the turn bracket on the sling 6 Lower the weight of the display onto the slings 7 Remove the c...

Page 9: ...nobstructed view from ceiling to floor to ensure free scoreboard travel Hoist operators should be trained according to the hoist manufacturer s specifications 2 2 Assembly Details Reference Drawings S...

Page 10: ...o be able to support the weight of the whole scoreboard after it is assembled on the arena floor The bottom ends of the supports should extend about 1 16 beyond the bottom of the lower ad panels so th...

Page 11: ...board requires two mounting strips 1 Lift one ad panel or message board section into place atop the scoreboard section Align the holes along the back bottom of the display with the threaded inserts in...

Page 12: ...sembly 1 Position each corner shroud across the appropriate corner and mark the locations of the holes on the scoreboard ad panel or message center 2 Drill 9 64l 3 5mm holes as guide holes for the scr...

Page 13: ...isplay so that it is accessible to plug in the power cord Each scoreboard is equipped with a 120V AC three prong plug for power in and power out 2 Determine which section is the closest to the grounde...

Page 14: ...labeled Signal In located on the right side of the scoreboard 5 Begin with one signal cord and plug it into the jack labeled Signal Out 6 Insert the signal cord into the Signal In jack on the display...

Page 15: ...oose or missing bolts Inspect the attachment bracket for loose bolts or cracks in members or welds Check torque on all wire rope clips Hoist System The hoist systems must be inspected annually per OSH...

Page 16: ...ect manager 3 3 Segmentation and Digit Designation Reference Drawings Segmentation 7 Segment Bar Digit Drawing A 38532 In each digit certain LEDs always turn on and off together These groupings of LED...

Page 17: ...rovide significantly greater volume On a four sided scoreboard a single trumpet horn may be mounted behind one of the scoreboard faces pointing down at the playing area Contact Daktronics for more inf...

Page 18: ...lace driver Broken wire between LED driver and digit Poor contact at driver connector Secure pins tightly in plugs Segment stays lit Driver shift register failure Short circuit on digit Replace driver...

Page 19: ...enish the customer s spare parts inventory if a component fails it saves money and reduces downtime Under normal circumstances Daktronics sends a reconditioned replacement part within a 24 hour period...

Page 20: ...l is due when you receive it Daktronics expects immediate return of an exchange part if it does not solve the problem The company also reserves the right to refuse equipment that has been damaged due...

Page 21: ...3 7 This is how to reach us Mail Customer Service Daktronics Inc P O Box 5128 331 32nd Avenue Brookings SD 57006 Phone Daktronics Help Desk 1 877 605 1115 toll free or 1 605 697 4036 Fax 1 605 697 444...

Page 22: ......

Page 23: ...Panel Message Cntr Hookup Drawing A 109746 LED Driver Drawing A 119205 Schematic LED TNMC for AS5000 Drawing A 125174 Electrical Specs H 2024 w TNMC Drawing A 126677 Electrical Specs H 2026 w TNMC Dra...

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ......

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ...Hoist Suspension Systems B 1 Appendix B Hoist Suspension Systems Centerhung Scoreboard Hoist Suspension Specifications SL3610 Scoreboard Hoist Systems Defined SL3710...

Page 48: ......

Page 49: ...n Shall have lifting speed range of 5 9 fpm n Shall have two separate cables per pick point on two pick point systems n Shall have integral motor disc brake rated in excess of 150 of full load motor t...

Page 50: ...alled and functionaly on at least two installations for a period of one year or be field testable for functionality n Installation to include operator training and signed receipt of those trained n Re...

Page 51: ......

Page 52: ......

Page 53: ...Hockey Goal Lights C 1 Appendix C Hockey Goal Lights Goal Light Components Drawing A 22927...

Page 54: ......

Page 55: ......

Reviews: