4
Mechanical Installation
2.3 Installing the Display
Fuelight
™
Petroleum Price displays are
designed to be installed into pre-
fabricated sign cabinets. A rectangular
opening must be provided to
accommodate the display. Refer to the
appropriate
Shop Drawing
for
dimension requirements.
Displays can be hand lifted into the
an example.
Note:
Daktronics assumes no liability
for display damage or injury resulting
from incorrect setup or incorrect lifting
methods.
Drill through the front flanges of the
cabinet to attach the display to the base
structure using appropriate hardware
for the site conditions. Actual site
demands will dictate variances and
appropriate mounting methods.
The structure design should only be done by a qualified individual. It is the customer’s
responsibility to ensure that the structure and the connectors are adequate. Daktronics is not
responsible for the installations or the structural integrity of support structures installed by