Mechanical Installation
7
Section 3:
Mechanical Installation
Mechanical installation consists of lifting and permanently mounting the scoreboard and any optional
advertising panels or message centers. The mechanical specification drawings listed in
Appendix A
show measurements, cable attachment points, and mounting weights for each scoreboard model.
Be sure that the installation complies with local building codes.
Note:
Daktronics does not assume any liability for any installation derived from the information
provided in this manual or installations designed and installed by others.
Below is a general overview of the entire installation process. Each step is detailed in the sections that
follow, and the instructions are presented in the general order in which events should occur.
1.
Plan and install the hoist or static-suspension structure.
2.
Provide power circuit(s) and outlet(s) at the scoreboard location.
3.
Provide a power outlet at the control location.
4.
Route signal cable from the control location to the scoreboard location, and install the
junction box (if the system is not controlled by radio).
5.
Assemble the scoreboard frame.
6.
Attach the lower ad panel supports to the frame, if required, and mount the lower
ad panels.
7.
Mount the scoreboard sections to the frame and join them at the top.
8.
Route and connect all power cords and signal cables around the top of the scoreboard.
9.
Mount the upper ad panels or message centers, if required.
10.
Mount ad panels atop the message center, if required.
11.
Make power and signal connections between message center sections and/or power
connections for backlit ad panels, if required.
12.
Attach the corner shrouds.
13.
Lift the scoreboard assembly and static-mount, or lower the hoist and attach it to the
scoreboard assembly.
14.
Make the final power and signal hookup to each tier of the display (scoreboard tier,
backlit ad panel tier, message center tier).
3.1 Lifting the Scoreboard
Daktronics ColorSmart scoreboards are shipped equipped with a single eyebolt for lifting the
display into place. The eyebolt is located in the center of the top of the scoreboard cabinet.
Daktronics indoor scoreboards use
3
/
8
" eyebolts. Use the single eyebolt at the top of the
scoreboard section only to lift the display into position for assembly.
Note:
Eyebolts are intended for lifting only. Do not attempt to permanently support the
display by its eyebolt. Daktronics assumes no liability for damages resulting from
incorrect setup or lifting methods.
Summary of Contents for COLORSMART BB-3102
Page 2: ......
Page 4: ......
Page 10: ......
Page 26: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 50: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ...B PTS FOULS PLYR HOME PERIOD FOUL B daktronics FOULS GUEST ...
Page 58: ......
Page 59: ...GUEST B HOME PERIOD B PERIOD B HOME B GUEST B B ...
Page 61: ...GUEST GUEST B HOME PERIOD B PERIOD B HOME B B B B B ...
Page 66: ......
Page 67: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ...5 TAN RED 1 3 SIGNAL VIO BLK 2 PNK 4 ...
Page 74: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ...04 01 OCT 12 KZB ADDED RADIO HARNESS DETAILS ...
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 100: ......
Page 104: ......
Page 106: ......