14
Mechanical Installation
If the scoreboard is to be suspended from a hoist:
1.
Attach the cable sling to the four lift tubes on the corner braces of the frame.
2.
Lower the hoist cables and attach them to the master links.
3.
Raise the scoreboard 1-2' (305-610 mm) from the floor, and level the scoreboard by
adjusting the turnbuckles built into the slings.
4.
The hoist installer must set upper and lower primary limits and all safety limits.
Daktronics recommends maintaining a minimum of 2' (610 mm) between the
scoreboard and the nearest obstruction.
WARNING! Never raise or lower the scoreboard with personnel or equipment underneath!
Summary of Contents for COLORSMART BB-3102
Page 2: ......
Page 4: ......
Page 10: ......
Page 26: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 50: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ...B PTS FOULS PLYR HOME PERIOD FOUL B daktronics FOULS GUEST ...
Page 58: ......
Page 59: ...GUEST B HOME PERIOD B PERIOD B HOME B GUEST B B ...
Page 61: ...GUEST GUEST B HOME PERIOD B PERIOD B HOME B B B B B ...
Page 66: ......
Page 67: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ...5 TAN RED 1 3 SIGNAL VIO BLK 2 PNK 4 ...
Page 74: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ...04 01 OCT 12 KZB ADDED RADIO HARNESS DETAILS ...
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 100: ......
Page 104: ......
Page 106: ......