Dake Corporation
1809 Industrial Park Dr
Grand Haven, MI 49417
974355-2
9
REV112019
SET UP
TRANSPORTING AND ANCHORING
When you receive your machine, you will need a forklift for transporting. When lifting the
machine, a sling or original shipping pallet needs to be used.
Position the machine on a firm cement floor, keeping a minimum distance from 3 feet from any
wall. Anchor it to the ground using screws and expansion plugs or tie rods sunk in the cement,
ensure it is sitting level before anchoring.
Minimum requirements for working environment of the machine:
•
Main voltage and frequency complying with the machine motor characteristics.
•
Environmental temperature from 15°F to 120°F, (-10°C to +50°C).
•
Relative humidity no higher than 90%.
ELECTRICAL CONNECTION
The machine is not provided with an electrical plug, so the customer must find a suitable one for
working conditions. Machine should be wired by professional electrician.
Three-Phase machine wiring diagram below:
After the machine is wired, ensure that the cutting direction matches the illustration below:
ASSEMBLING THE MACHINE
•
Screw the cut length stop rod into the right-hand side of the vise casting as shown in the
picture, use the provided nut to tighten firmly in place.
•
Fit and align the roller carrying arm on the counter-vise bench.