![DaimlerChrysler Jeep Grand Cherokee 2002 Service Manual Download Page 134](http://html1.mh-extra.com/html/daimlerchrysler/jeep-grand-cherokee-2002/jeep-grand-cherokee-2002_service-manual_3217227134.webp)
TEST
ACTION
APPLICABILITY
4
Turn the ignition off.
Disconnect the S/C ON/OFF/SET Switch harness connector.
Disconnect the ECM harness connectors.
Measure the resistance of the Sensor Ground circuit.
Is the resistance below 10.0 ohms?
All
Yes
→
Replace and program the Engine Control Module in accordance
with the Service Information.
Perform SPEED CONTROL VERIFICATION - VER-4.
No
→
Repair the Sensor Ground circuit for an open.
Perform SPEED CONTROL VERIFICATION - VER-4.
5
Turn the ignition off.
Disconnect the S/C ON/OFF/SET Switch harness connector.
Disconnect the ECM harness connectors.
Turn the ignition on.
Measure the voltage of the S/C Switch Signal circuit.
Is the voltage above 1.0 volt?
All
Yes
→
Repair the S/C ON/OFF/SET Switch Signal circuit for a short to
voltage.
Perform SPEED CONTROL VERIFICATION - VER-4.
No
→
Replace and program the Engine Control Module in accordance
with the Service Information.
Perform SPEED CONTROL VERIFICATION - VER-4.
126
DRIVEABILITY - DIESEL
P0579-S/C SWITCH SIGNAL CIRCUIT SIGNAL VOLTAGE TOO HIGH —
Continued
Summary of Contents for Jeep Grand Cherokee 2002
Page 8: ...NOTES viii ProCarManuals com...
Page 18: ...NOTES 10 ProCarManuals com...
Page 19: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 11 ProCarManuals com...
Page 262: ...NOTES 254 ProCarManuals com...
Page 265: ...C O M P O N E N T L O C A T I O N S 257 COMPONENT LOCATIONS ProCarManuals com...
Page 275: ...C O N N E C T O R P I N O U T S 267 CONNECTOR PINOUTS ProCarManuals com...
Page 280: ...NOTES 272 ProCarManuals com...
Page 282: ...NOTES 274 ProCarManuals com...
Page 283: ...11 0 CHARTS AND GRAPHS C H A R T S A N D G R A P H S 275 CHARTS AND GRAPHS ProCarManuals com...
Page 284: ...NOTES 276 ProCarManuals com...