![DaimlerChrysler Jeep Grand Cherokee 2002 Service Manual Download Page 129](http://html1.mh-extra.com/html/daimlerchrysler/jeep-grand-cherokee-2002/jeep-grand-cherokee-2002_service-manual_3217227129.webp)
TEST
ACTION
APPLICABILITY
6
Turn the ignition off.
Disconnect the Generator Field harness connector.
Measure the resistance of the Field Control terminals on the back of the Generator.
Is the resistance between 2 and 6 ohms?
All
Yes
→
No
→
Repair or replace the Generator as necessary.
Perform CHARGING VERIFICATION - VER-3.
7
Turn the ignition off.
With a voltmeter, measure and record the voltage between the Battery terminals.
Disconnect the ECM harness connectors.
Remove the ASD Relay from the PDC.
Connect a jumper wire between cavity 30 and cavity 87 of the ASD Relay connector.
Turn the ignition on.
Measure the voltage of the ASD Relay Output circuits and B) Sense circuit in
the ECM C1 harness connector.
Are all voltage measurements within 0.5 volt of each other?
All
Yes
→
No
→
Repair the circuit that had high resistance.
Perform CHARGING VERIFICATION - VER-3.
8
Turn the ignition off.
Disconnect the ECM harness connectors.
Disconnect the Generator Field harness connector.
Remove the ASD Relay from the PDC.
Connect a jumper wire between cavity 30 and cavity 87 of the ASD Relay connector.
Turn the ignition on.
Measure the voltage of the Generator Field Control circuit.
Is the voltage below 1.0 volt?
All
Yes
→
No
→
Repair the Generator Field Control circuit for a short to voltage.
Perform CHARGING VERIFICATION - VER-3.
9
Turn the ignition off.
Disconnect ECM harness connectors.
Disconnect the Generator Field harness connector.
Measure the resistance between ground and the Generator Field Control circuit.
Is the resistance above 100 kohms?
All
Yes
→
No
→
Repair the Generator Field Control circuit for a short to ground.
Perform CHARGING VERIFICATION - VER-3.
10
Turn the ignition off.
Disconnect the ECM harness connectors.
Disconnect the Generator Field harness connector.
Measure the resistance of the Generator Field Control circuit.
Is the resistance below 5.0 ohms?
All
Yes
→
No
→
Repair the Generator Field Control circuit for an open.
Perform CHARGING VERIFICATION - VER-3.
121
DRIVEABILITY - DIESEL
P0560-SYSTEM VOLTAGE TOO LOW —
Continued
Summary of Contents for Jeep Grand Cherokee 2002
Page 8: ...NOTES viii ProCarManuals com...
Page 18: ...NOTES 10 ProCarManuals com...
Page 19: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 11 ProCarManuals com...
Page 262: ...NOTES 254 ProCarManuals com...
Page 265: ...C O M P O N E N T L O C A T I O N S 257 COMPONENT LOCATIONS ProCarManuals com...
Page 275: ...C O N N E C T O R P I N O U T S 267 CONNECTOR PINOUTS ProCarManuals com...
Page 280: ...NOTES 272 ProCarManuals com...
Page 282: ...NOTES 274 ProCarManuals com...
Page 283: ...11 0 CHARTS AND GRAPHS C H A R T S A N D G R A P H S 275 CHARTS AND GRAPHS ProCarManuals com...
Page 284: ...NOTES 276 ProCarManuals com...