Complete

The display on the remote controller shows a flashing

  PE

  code

for signalling that automatic charging will be finished in about 10
minutes.
When the unit stops operating, close valve A immediately and
check the LEDs and check if the 

P9

  code is displayed on the

remote controller.

If the LED indication is not as shown above, correct the
malfunction (as indicated in the display of the remote controller)
and restart the complete charging procedure. When the
charging amount is little, the 

PE

 code may not be displayed, but

instead the 

P9

 code will be displayed immediately.

10. In case leak detection function required

Press the 

 button once for post-processing with

regard to the leak detection function and press the 
button to confirm that charging is completed. 
Record the amount that was added on the additional refrigerant
charge label provided with the unit and attach it on the back side
of the front panel.
Perform the procedure 

"11.6. 

Procedure for inputting the

additional refrigerant charge weight into the PCB"

 as described

on 

page 19

.

10. In case leak detection function not required

Press the 

 button once and the charging is complete. 

Record the amount that was added on the additional refrigerant
charge label provided with the unit and attach it on the back side
of the front panel.
Perform the procedure 

"11.6. 

Procedure for inputting the

additional refrigerant charge weight into the PCB"

 as described

on 

page 19

.

2

Normal system display

3

Remote controller malfunction code display

Remote controller heating mode malfunction codes

Remote controller cooling mode malfunction codes

11.6. Procedure for inputting the additional 

refrigerant charge weight into the PCB

Availability of the leak detection function feature requires input of the
additional refrigerant charge amount immediately after finishing the
automatic charging. The input must be executed before performing
the test operation.

Procedure

1

Close the electric box lid and all front panels except the one on
the side of the electric box.

2

Press and hold the 

 button for 5 seconds to enter into

setting mode 2. 

The H1P LED is on 

w

.

3

Press the 

 button 14 times.

The LED display must be as follows:

Press the 

 button once as confirmation of the

LEDs combination.
LEDs will be blinking in function of the last entered setting
(factory setting = 0 kg).

H1P

H2P

H3P

H4P

H5P

H6P

H7P

c c c w w w w

NOTE

Always close valve A and remove the refrigerant
tank immediately after finishing the refrigerant
charge operation.

The refrigerant charge port of these units have
electric expansion valves that will close
automatically when refrigerant charging operation
has finished. However, the electric expansion
valves will be opened when other operations start
after finishing refrigerant charging operation.

If the refrigerant tank is left with the valve open,
the amount of refrigerant which is properly
charged may be off the point.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

w c c w w w w

Beware of the fan blades when you open the front panel.
The fan may still rotate for a while after unit operation has
stopped.

LED display

(Default status

before delivery)

Micro-

computer
operation

monitor

Mode

Ready

/Error

Cooling/Heating 

changeover

Low 

noise

Demand

Indivi-

dual

Bulk 

(master)

Bulk 

(slave)

HAP

H1P

H2P

H3P

H4P

H5P

H6P

H7P

Outdoor unit system

c

x

x

w

x

x

x

x

BS4  TEST

BS1  MODE

BS1  MODE

Error code 

P8 

recharge 
operation

Close valve A immediately and press the TEST OPERATION 
button once.
The operation will restart from the charging mode judgement 
onwards.

P2

charge 
hold

Close valve A immediately. Check 
following items:
- Check if the gas stop valve is opened 

correctly

- Check if the valve of the refrigerant 

cylinder is opened

- Check if the air inlet and outlet of the 

indoor unit are not obstructed

After correcting the 
abnormality, restart 
the automatic 
charging procedure 
again.

Error code 

PE

Charging is almost finished. Ready to close valve A.

P9

Charging is finished. Close valve A and remove the refrigerant 
tank.

PA

PH

replace 
cylinder

Close valve A and replace the empty cylinder. 
After replacing the cylinder, open valve A again and continue the 
work (the outdoor unit will not stop operating).

P8 

recharge 
operation

Close valve A immediately.
Restart the automatic charging procedure again.

P2

charge 
hold

Close valve A immediately. Check 
following items:
- Check if the high pressure/low 

pressure gas pipe, suction gas pipe 
and liquid pipe stop valves are opened 
correctly

- Check if the valve of the refrigerant 

cylinder is opened

- Check if the air inlet and outlet of the 

indoor unit are not obstructed

After correcting the 
abnormality, restart 
the automatic 
charging procedure 
again.

*
abnormal 
stop

Close valve A immediately. Confirm the 
malfunction code by the remote controller 
and correct the abnormality by following 
the 

"Correcting after abnormal completion 

of the test operation" on page 24

.

If a wrong value is input for the additional charged
refrigerant weight, the accuracy of the leak detection
function will decrease.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

w x

x w w w x

BS1  MODE

BS2  SET

BS3  RETURN

Summary of Contents for VRVIII REYQ-P8

Page 1: ...INSTALLATION MANUAL REYQ8P8Y1B REYQ10P8Y1B REYQ12P8Y1B REYQ14P8Y1B REYQ16P8Y1B System air conditioner...

Page 2: ...m e 100 mm f 500 mm 4 a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm 1500 500 13 2 1 6 3 4 6 5 6 9 10 7 8 2 1 A B C 5 3 2 1 6 4 3 4 2 b a c d A C B D a e b d e A...

Page 3: ...jeidemme mukaisesti 14 za p edpokladu e jsou vyu v ny v souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m 15 u skladu sa slijede im standardom ima ili drugim normativni...

Page 4: ...ujam temperat ra TS TSmin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana P bar...

Page 5: ...ging from 25 0 to 50 0 kW For changing the refrigerant flow to indoor units the REYQ P system can be combined with BS units of the types BSVQ100P BSVQ160P and BSVQ250P only Other BS unit types will ca...

Page 6: ...he Engineering Data Book Outdoor unit Total capacity of indoor units REYQ8 100 260 REYQ10 125 325 REYQ12 150 390 REYQ14 175 455 REYQ16 200 520 NOTE If the total capacity of the connected indoor units...

Page 7: ...nt concentration from exceeding allowable safety limits in the event of a refrigerant leak 11 To prevent dripping water to form a puddle underneath the unit install a drain pan available as option kit...

Page 8: ...foundation dimension 7 Distance between foundation bolt holes X Not allowed O Allowed units mm Prepare a water drainage channel around the foundation to drain waste water from around the unit If the...

Page 9: ...the pipe size nearest to the required size use the suitable adapters for the change over from inch to mm pipes field supply 6 3 Pipe connection Be sure to perform a nitrogen blow when brazing and to r...

Page 10: ...the system Great caution is needed when passing copper tubes through walls Block all gaps in the holes for passing out piping and wiring using sealing material field supply The capacity of the unit wi...

Page 11: ...outdoor unit side choose from the following table in accordance with the capacity of the outdoor unit example refnet joint A How to select the refnet header Choose from the following table in accordan...

Page 12: ...igerant branch kit to indoor units is 40 m or less however it can be extended up to 90 m if all the following conditions are fulfilled Required conditions Example drawings It is necessary to increase...

Page 13: ...Valve B 13 Valve C 14 Outdoor unit 15 To BS unit or indoor unit 16 Stop valve 17 Service port 18 Field piping 19 Gas flow NOTE Make sure to perform leak test and vacuum drying using the service ports...

Page 14: ...2 liquid 2 H E liquid 2 R10 Resistor current sensor R31T R32T Thermistor discharge M1C M2C R50 R59 Resistor R90 Resistor current sensor R95 Resistor current limiting S1NPH Pressure sensor high S1NPL...

Page 15: ...to leaked electrical current which will have to be discharged with the grounding Be sure to install an earth leakage breaker One that can handle high frequency electrical noise This unit uses an inve...

Page 16: ...of the transmission wiring terminals 1 Electric wiring diagram Printed on the back of the electric component box lid 2 Power wiring and ground wiring inside conduit When the wiring is routed out throu...

Page 17: ...iquid pipe 2 High pressure low pressure gas pipe 3 Finishing tape 4 Suction gas pipe 5 Transmission wiring 6 Insulation material 1 Power supply 380 415 V 3 N 50 Hz 2 Earth leakage breaker 3 Fuse 4 Gro...

Page 18: ...6 Refrigerant piping on page 4 The electrical work 1 Make sure there is no faulty power wiring or loose nuts See 8 Field wiring on page 9 2 Make sure there is no faulty transmission wiring or loose nu...

Page 19: ...t cannot be charged until all field wiring and field piping has been completed Refrigerant may only be charged after performing the leak test and the vacuum drying Charge the liquid refrigerant with t...

Page 20: ...tem charging over the permissible quantity can cause liquid hammer Always use protective gloves and protect your eyes when charging refrigerant When the refrigerant charging procedure is done or when...

Page 21: ...indoor temperature The unit will automatically select the cooling mode or heating mode for charging Outdoor temperature 0 C DB 43 C DB Indoor temperature 10 C DB 32 C DB Total indoor unit capacity 80...

Page 22: ...and may cause overcharging 7 Ready Press the button once within 5 minutes If the button is not pushed within 5 minutes P2 will be displayed on the remote controller Refer to 3 Remote controller malfun...

Page 23: ...e valve A and remove the refrigerant tank immediately after finishing the refrigerant charge operation The refrigerant charge port of these units have electric expansion valves that will close automat...

Page 24: ...x w w 20 95 x 100 w x w x w x x 21 100 x w x w x w x w NOTE If you get confused in the middle of the input process press the button to return to setting mode 1 initial state The H1P LED is off x Resum...

Page 25: ...tons LED state Throughout the manual the state of the LEDs is indicated as follows Setting the push button switch BS1 5 Function of the push button switch which is located on the outdoor unit PCB A1P...

Page 26: ...ormal w abnormal c under preparation or under test operation 2 Indication of low noise operation state x standard operation factory setting w operation 3 Indication of power consumption limitation set...

Page 27: ...seconds The H1P LED is on w Perform following steps 1 Press the button 3 times 2 Press the button once to confirm 3 Press the button in order to change the LED display to the following display 4 Press...

Page 28: ...iping length and correct the refrigerant charge level by recovering any excessive refrigerant with a refrigerant recovery machine Insufficient refrigerant E4 F3 Check if the additional refrigerant cha...

Page 29: ...pipe stop valve service port with the unit not operating refer to Pre charging on page 17 make sure to charge the remaining charging quantity using the following procedure 1 Turn the power of the ind...

Page 30: ...as the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calculations in steps 1 and 2 above If the result o...

Page 31: ...N D UNIT TO OUT D UNIT TO IN D UNIT TO OUT D UNIT F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 8 7 7 6 6 3 5 6 13 12 1 1 2 3 4 5 3 4 7 8 2 9 6 4 1 2 5 7 7 8 1 9 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6...

Page 32: ...4PW39996 1A Copyright Daikin...

Reviews: