Outside the units, the transmission wiring must be finished simulta

-

neously with the local refrigerant piping, and wound with tape (field 
supply) as shown in the figure below.

1

2

3

4

5

1

Liquid pipe

2

Gas pipe

3

Transmission wiring

4

Insulation material

5

Finishing tape

• 

For multi system: 

Transmission wiring between outdoor units in the same piping 
system must be connected to terminals Q1 and Q2 (TO MULTI 
UNIT).
Connecting the wires to the F1, F2 (TO OUT/D UNIT) terminals 
results in system malfunction.

Wiring to other systems should be connected to terminals F1 and 
F2 (TO OUT/D UNIT) on the printed circuit board of the master 
unit. The outdoor unit that connects transmission wiring to indoor 
unit is the master unit. The others are sub unit.

9.5.  Power wiring connection procedure

• 

Be sure to connect the power supply wiring to the power supply ter

-

minal block and hold it in place using the included clamp as shown 
in the figure below.

• 

The L1, L2 and L3 phases of the power wiring should be secured 
separately to the hook using the included clamp (1).

• 

The ground wiring should be bound to the power wiring using the 
included clamp (1) to prevent outside force from being applied to the 
terminal area.

RXYQ72-168X type

1

4

2

3

7

6

9

8

5

1

Power supply (3-575V 60 Hz)

2

Branch switch, Overcurrent breaker

3

Ground wire

4

Control box 

5

Attach insulation sleeves

6

Power supply terminal block

7

Ground terminal

8

Clamp (1) (accessory)

9

Vinyl tube (accessory)

 CAUTION

• 

Be sure to use crimp-style terminal with insulating sleeves for con

-

nections. (See the figure below.)

Crimp-style terminal

Insulating sleeve

Power wire

• 

For wiring, use the designated power wire and connect firmly, then 
secure to prevent outside pressure being exerted on the terminal 
board.

• 

Use an appropriate screwdriver for tightening the terminal screws. 
A screwdriver with a small head will strip the head and make proper 
tightening impossible.

• 

Over-tightening the terminal screws may break them.
See the following table for the tightening torque of the terminal screws.

Screw size

Tightening torque

M8 Power terminal

4.20-5.09 ft

lbf (5.7-6.9 N

m)

M8 Ground terminal

7.15-8.63 ft

lbf (9.7-8.63 N

m)

• 

When pulling the ground wire out, wire it so that it comes through the 
cut out section of the cup washer. (See the figure below.) An improper 
ground connection may prevent a good ground from being achieved.

Crimp-style terminal

Cut out section

Cup washer

• 

When 2 wires are connected to a single terminal, connect them so 
that the rear sides of the crimp contacts face each other. Also, make 
sure the thinner wire is on top, securing the 2 wires simultaneously 
to the resin hook using the included clamp (1).

Crimp-style 

terminal 

Wire : narrow

Terminal 

block

Wire : thick

Resin hook

9.6.  Procedure for Wiring Inside Units

• 

Referring to the figure below, secure and wire the power and trans

-

mission wiring using the included clamp (1), (2) and (3).

• 

Wire so that the ground wiring does not come into contact with the 
compressor lead wiring.
If they touch, this may have an adverse effect on other devices.

• 

The transmission wiring must be at least 2 in. (51 mm) away from 
the power wiring. 

01_EN_03_Body_3P734038-4.indd   20

01_EN_03_Body_3P734038-4.indd   20

2023/05/29   17:14:40

2023/05/29   17:14:40

Summary of Contents for VRV RXYQ72XBYC Series

Page 1: ...rmation the online instructions are to be used Veuillez visiter http www daikinac com content resources manuals pour obtenir la version la plus r cente des instructions d installation et du manuel de...

Page 2: ...manual Improper installation could result in water leakage electric shock or fire When installing the unit in a small room take measures to keep the refrigerant concentration from exceeding allow abl...

Page 3: ...ation only Outdoor units can be installed either outdoors or indoors This unit is for outdoor use Do not install the air conditioner or heat pump in the fol lowing locations a Where a mineral oil mist...

Page 4: ...ield wiring 18 9 1 Power circuit safety device and cable requirements 19 9 2 Wiring connection example for whole system 19 9 3 Leading wire procedure 19 9 4 Transmission wiring connection procedure 20...

Page 5: ...XYQ X units are as indicated in tables below where RXYQ 192 384 consists of multiple RXYQ 96 168 single mod ules as indicated 72 96 120 144 168 RXYQ72XBYC 1 RXYQ96XBYC 1 RXYQ120XBYC 1 RXYQ144XBYC 1 RX...

Page 6: ...00 1 3 2 Outdoor Unit Combinations Total capacity of indoor units needs to be within the specified range Capacity Range 6 ton 8 ton 10 ton 12 ton 14 ton 16 ton 18 ton RXYQ 72XBYC 96XBYC 120XBYC 144XBY...

Page 7: ...it Installation location is flat to prevent vibrations and noise generation and to have sufficient stability The space around the unit is adequate for maintenance and servic ing refer to 5 2 Service s...

Page 8: ...the unit turning over 4 2 Weather related precautions Be sure that the air inlet of the unit is not positioned towards the main wind direction Frontal wind will disturb the operation of the unit If n...

Page 9: ...possibilities a b a c d a b a e d e c a b a e d f c a b a e b d c a b a e d f c 1 2 3 5 4 ABCD Sides along the installation site with obstacles Suction side A B C D A B 1 a 3 8 10 b 11 3 4 300 c 3 8 1...

Page 10: ...ering Data Book 6 Inspecting handling and unpacking the unit 6 1 Inspection At delivery the unit must be checked and any damage must be re ported immediately to the carrier s claims agent 6 2 Handling...

Page 11: ...ins 13 16 in 20 mm above the foundation surface A A 13 16 in 20 mm NOTE There are restrictions on the refrigerant pipe connecting order between outdoor units in the case of the multi system See 1 2 2...

Page 12: ...rk is complete do not under any circumstances open the stop valve until 9 Field wiring on page 18 and 12 Checking of device and installation conditions on page 24 are complete Do not use flux when bra...

Page 13: ...8 in 15 9 mm 3 8 in 9 5 mm 54 72 3 4 in 19 1 mm 72 111 7 8 in 22 2 mm 111 162 1 1 8 in 28 6 mm 1 2 in 12 7 mm 162 230 5 8 in 15 9 mm 230 300 1 3 8 in 34 9 mm 3 4 in 19 1 mm 300 1 5 8 in 41 3 mm Examp...

Page 14: ...KHRP26M72TUA 246 KHRP26M73TU9 KHRP26M73TUA Concerning REFNET headers choose from the following table in accordance with the total capacity of all the indoor units connected after the REFNET header Ind...

Page 15: ...1 1 a b c d e f g h i j k l m n p 3280 ft 1000 m Example 2 1 a b c d e f g h i j k l m n p 3280 ft 1000 m Example 1 2 a b c d e f g h i j k 3280 ft 1000 m Example 1 3 a b c d e f g h I 3280 ft 1000 m...

Page 16: ...pipe size of the main pipe then the pipe size of the main pipe has to be increased as well Increase the pipe size as follows f3 8 f1 2 f1 2 f5 8 f5 8 f3 4 f3 4 f7 8 f7 8 f1 3 f1 1 8 f1 1 4 3 f1 3 8 f...

Page 17: ...ffects valves and compressors in the refrigerating system and prevents proper operation The Dry Nitrogen pressure should be set to 2 9 psi 0 02 MPa i e just enough so it can be felt on the skin with a...

Page 18: ...Protective plate Stop valves mounting plate 5 Cut off the lower part of the smaller pinched piping with an ap propriate tool such as pipe cutters Let the remaining oil drip out in case the recovery wa...

Page 19: ...its multiple outdoor units system To connect the piping between outdoor units an optional multi connection piping kit BHFP22P100U BHFP22P100UA and BHF P22P151U BHFP22P151UA are always required When in...

Page 20: ...zontal plane Mount the REFNET header so that it branches horizontally 2 Installation of the multi connection piping kit 1 B 1 C D 15 15 A C 4 3 4 in 120 mm D 19 11 16 in 500 mm Install the joints hori...

Page 21: ...he service port cover 9 Field wiring NOTE All field wiring and components must be installed by a licensed elec trician and must comply with relevant local and national regulations Be sure to use a ded...

Page 22: ...0Hz f3 60Hz f3 60Hz f3 60Hz f3 60Hz f3 60Hz f3 60Hz f3 60Hz f3 60Hz 575V 575V 575V 575V 575V 575V 575V 575V 575V 575V 575V 575V 575V 575V 15 1 16 8 18 2 22 3 24 9 16 8 16 8 16 8 18 2 18 2 18 2 18 2 22...

Page 23: ...ng the printed circuit board A1P of Master unit NOTE Do not connect the power wiring to terminals for the transmission wiring Doing so would destroy the entire system Wiring to the indoor unit should...

Page 24: ...ating sleeves for con nections See the figure below Crimp style terminal Insulating sleeve Power wire For wiring use the designated power wire and connect firmly then secure to prevent outside pressur...

Page 25: ...Air tight test and vacuum drying After finished piping work carry out air tight test and vacuum drying NOTE Always use nitrogen gas for the air tightness test Absolutely do not open the stop valve unt...

Page 26: ...icrons vacuum break with nitrogen gas and evacuate the system again using the vacuum pump for 1 hour to 500 microns or less vacuum drying If the system cannot be evacuated to 500 microns within 2 hour...

Page 27: ...segment display s To access you can remove the service window cover see figure Now you can open the inspection door of the control box cover see figure You can see 3 push buttons and 3 seven segment d...

Page 28: ...to the system Result mode 1 setting 10 is addressed and selected return value is monitored information To leave the monitoring function push BS1 one time you will return to the default situation when...

Page 29: ...ctory charged with refrigerant and depending on pipe sizes and pipe lengths systems require additional charg ing of refrigerant See 14 2 Calculating the additional refrigerant charge In case recharge...

Page 30: ...BYC RXYQ120XBYC Indoor units FXMQ type 18 1 24 1 30 1 36 2 FXFQ type 36 2 Other 48 1 Liquid piping a f3 4 60 ft e f1 4 15 ft i f3 8 20 ft m f3 8 15 ft r f1 2 10 ft b f5 8 20 ft f f3 8 10 ft j f3 8 10...

Page 31: ...he refrigerant composition to change preventing normal operation Before charging check whether the refrigerant cylinder is equipped with a siphon tube or not If a siphon tube is equipped change the li...

Page 32: ...itional refrigerant charge is larger than 22 lbs 10 kg perform step 3 till the end of the procedure 3 Pre charging can be done without compressor running by con necting the refrigerant tank only to th...

Page 33: ...er adding the refrigerant do not forget to close the cover of the service port The tightening torque for the cover is 8 48 to 10 3 ft lbf 11 5 to 13 9 N m 15 Start up and configuration INFORMATION It...

Page 34: ...ethod is to enable low noise operation based on an external input For this operation an optional acces sory is required 1 2 shows the status of power consumption limitation operation 1 unit is current...

Page 35: ...xternal control adaptor DTA104A61 62 is installed Default value 0 To activate this function change 2 12 1 2 18 Fan high static pressure setting In order to increase the static pressure the outdoor uni...

Page 36: ...this setting activates and defines the level power consumption limitation that will be applied continuously The level is according to the table Default value 0 OFF Value 2 32 Restriction reference 0...

Page 37: ...refrigerant temperature target based on 2 9 is kept without any correction unless for protection control For more information and advice about the effect of these settings see 15 3 Energy saving and o...

Page 38: ...eit Celsius 0 5 2 8 C 1 10 default 5 6 C default 2 15 8 3 C 15 2 4 Heat pump lockout New control logic to provide more application options for cold climates Outside temperature can now be measured dir...

Page 39: ...omatically be set This will allow the auxiliary or secondary heat source to be automatically energized in the event of a system failure Error codes capable of auto backup are listed in the table below...

Page 40: ...ng for the customer The selection method of indoor units is important and has to be considered as the available capacity is not the same as under basic operation For details concerning to Hi sensible...

Page 41: ...m the indoor units becomes more moderate the system will eventually go to the steady state condition which is defined by the operation method above The start up condition is different from the powerfu...

Page 42: ...cal wiring air purge etc See installation manual of the indoor units for details CAUTION Do not insert fingers rods or other objects into the air inlet or outlet When the fan is rotating at high speed...

Page 43: ...ons and DIP switches on the printed circuit board on page 24 Push BS2 for 5 seconds or more The unit will start test operation The test operation is automatically carried out the outdoor unit display...

Page 44: ...Electronic expansion valve malfunction Y5E A7P X8A Check connection on printed circuit board or actuator 32 37 42 Electronic expansion valve malfunction Y7E A7P X11A Check connection on printed circui...

Page 45: ...07 09 11 Low pressure sensor malfunction short circuit S1NPL A1P X31A Check connection on printed circuit board or actuator LC 14 15 16 Transmission trouble A4P X6A A1P X28A Check connection 19 20 21...

Page 46: ...smission wired unit amount matches with powered unit amount by monitor mode or wait till initialization is finished UF 01 Auto address malfunction inconsistency Check if transmission wired unit amount...

Page 47: ...its and outdoor unit expansion valves will fully open At that moment the segment display indica tion 01 and the user interface of all indoor units indicate Test Operation and CENTRAL CONTROL and the o...

Page 48: ...ally in accordance with the length or diameter of the refrigerant piping Total amount of refrigerant lbs kg in the system NOTE Where a single refrigerant facility is divided into 2 entirely independen...

Page 49: ...3P734038 4 EM23A011 2311 SP Daikin Texas Technology Park 19001 Kermier Road Waller TX 77484 U S A 00_CV_3P734038 4 indd 2 00_CV_3P734038 4 indd 2 2023 05 29 17 12 28 2023 05 29 17 12 28...

Reviews: