![background image](http://html.mh-extra.com/html/daikin/vrv-iv-s-rxysq4t8vb-series/vrv-iv-s-rxysq4t8vb-series_installer-and-user-reference-manual_2459213117.webp)
21
|
Commissioning
Installer and user reference guide
117
RXYSQ4~6T8V/YB
VRV IV-S system air conditioner
4P482277-1B – 2020.10
21.7 Operating the unit
Once the unit is installed and test operation of outdoor unit and indoor units is
finished, the operation of the system can start.
For operating the indoor unit, the user interface of the indoor unit should be
switched ON. Refer to the indoor unit operation manual for more details.