7
3P362438-5N English
6 . Inspecting, handling and unpacking the unit
6 .1 . Inspection
At delivery, the unit must be checked and any damage must be re-
ported immediately to the carrier’s claims agent.
6 .2 . Handling
1
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
2
Choose beforehand the path along which the unit is to be brought
in.
3
Bring the unit as close as possible to its final installation position in
its original package to prevent damage during transport.
4
4
2
2
4
3
3
1
1
Packaging material
2
Belt sling
3
Opening
4
Protector
4
Lift the unit preferably with a crane and 2 belts of at least 27 ft.
(8 m) long as shown in the figure above.
Always use protectors to prevent belt damage and pay attention to
the position of the unit’s center of gravity.
NOTE
Use a belt sling of
≤
3/4 in. (20 mm) wide that adequately bears the
weight of the unit.
A forklift can only be used for transport as long as the unit remains on
its pallet as shown above.
6 .3 . Unpacking
CAUTION
To avoid injury, do not touch the air inlet or aluminum fins of the unit.
WARNING
Tear apart and throw away plastic packaging bags so that children will
not play with them. Children playing with plastic bags face danger of
death by suffocation.
1
Remove the unit from its packing material.
Take care not to damage the unit when unpacking.
2
Remove the 4 bolts fixing the unit to its pallet.
3
Make sure that all accessories as mentioned in 2.1. Accessories
supplied with this unit on page 3 are available in the unit.
6 .4 . Installing the unit
Make sure the unit is installed level on a sufficiently strong base to
prevent vibration and noise.
NOTE
When the installation height of the unit needs to be increased, do not
use stands to only support the corners.
A
A
A
A
A
A
A
A
A
A
A
A
A
≥
3-7/8 in. (100 mm)
X Not allowed
O Allowed
•
The height of the foundation must be at least 5-7/8 in. (150 mm )
from the floor.
In heavy snowfall areas, this height should be increased, depending
on the installation place and condition.
•
The unit must be installed on a solid longitudinal foundation (steel
beam frame or concrete) and make sure the base under the unit is
larger than the gray marked area.
3
4
2
5
6
7
1
Dimensions for above figure
1 Hole for foundation bolt
f
9/16 in. (15 mm) dia: 4 positions
2
2 Inner dimension of
the base
≤
24-7/8 in. (631 mm)
3
Distance between
foundation bolt holes
29 in. (729 mm)
4 Depth of unit
30-3/16 in. (767 mm)
5
Outer dimension of the
base
≥
30-3/16 in. (767 mm)
6
Longitudinal foundation
dimension
72T type:
36-11/16 in. (932 mm)
96-168T type:
48-7/8 in. (1242 mm)
7
Distance between
foundation bolt holes
72T type:
30-3/16 in. (766 mm)
96-168T type:
42-3/8 in. (1076 mm)
01_EN_3P362438-5N.indb 7
12/11/2019 11:23:36 AM