background image

REMQ8~16P7Y1B
VRVIII System air conditioner
4PW37156-1

Installation manual

10

Pipe siz

e selection

F

or an outdoor unit m

ulti installation (REYQ20~48P), select the 

pipe siz

e in accordance with the f

ollo

wing figure

.

A.

 Piping between outdoor unit and refrigerant branc

h kit

B.

 Piping between outdoor unit m

ulti connection piping units

Choose from the f

ollo

wing tab

le in accordance with the outdoor unit total capacity type

, connected 

do

wnstream.

E.

 Piping between refrig

erant branc

h kit and BS unit

Pipe siz

e f

or direct connection to indoor unit m

ust be the same as the connection siz

e of indoor unit.

Choose from the f

ollo

wing tab

le in accordance with the outdoor unit total capacity type

, connected 

do

wnstream.

Outdoor unit 

capacity type (hp)

Piping outer diameter siz

e (mm)

Indoor unit capacity 

type (kW)

Piping outer diameter siz

e (mm)

Suction gas pipe

HP/LP gas pipe

Liquid pipe

Suction gas pipe

HP/LP gas pipe

Liquid pipe

8

19.1

15.9

9.5

<150

15.9

12.7

9.5

10

22.2

19.1

9.5

150

x<200

19.1

15.9

9.5

12

28.6

19.1

12.7

200

x<290

22.2

19.1

9.5

14 + 16

28.6

22.2

12.7

290

x<420

28.6

19.1

12.7

18

28.6

22.2

15.9

420

x<640

28.6

28.6

15.9

20 + 22

28.6

28.6

15.9

640

x<920

34.9

28.6

19.1

Piping temper grade and wall thic

kness

24

34.9

28.6

15.9

920

41.3

28.6

19.1

Te

mper g

rade:

 O type and 1/2 H type indicate the mater

ial type

26~34

34.9

28.6

19.1

Copper tube

(Ø mm)

Te

mper grade 

type

W

all thic

kness

36

41.3

28.6

19.1

F:

 Piping between refrig

erant branc

h kit or BS unit and indoor unit

Choose from the f

ollo

wing tab

le in accordance with the capacity type of the connected outdoor unit.

38~48

41.3

34.9

19.1

6.4

O

0.80

Indoor unit capacity 

type (kW)

Piping outer diameter siz

e (mm)

9.5

O

0.80

C.

 Piping between outdoor unit m

ulti connection piping kit and outdoor unit

Choose from the f

ollo

wing tab

le in accordance with the capacity type of the connected outdoor unit.

Suction gas pipe

Liquid pipe

12.7

O

0.99

20, 25, 32, 40, 50

12.7

6.4

22.2

1/2 H

0.80

Outdoor unit 

capacity type (hp)

Piping outer diameter siz

e (mm)

63, 80, 100, 125

15.9

9.5

28.6

1/2 H

0.99

Suction gas pipe

HP/LP gas pipe

Liquid pipe

200

19.1

9.5

31.8

1/2 H

1.10

8+10

22.2

19.1

9.5 x 0.8

250

22.2

9.5

34.9

1/2 H

1.21

12

28.6

19.1

12.7

38.1

1/2 H

1.32

14+ 16

28.6

22.2

12.7

D:

 Equaliz

er piping (outdoor units onl

y)

41.3

1/2 H

1.43

Piping outer diameter siz

e (mm)

19.1

Ho

w to calculate the ad

ditional refrig

erant to be c

har

g

e

d

Additional refr

iger

ant to be charged R (kg)

R should be rounded off in units of 0.1 kg 

Example f

or refrig

erant branc

h using refnet joint and refnet header 

for REYQ34 (REYQ34 = REMQ8+REMQ16)

If the outdoor unit is REYQ34 and the piping lengths are as belo

Note 1

When the equiv

alent pipe length betw

een outdoor and indoor units is 90 m or more

, the siz

e of the main 

pipes of the liquid side m

ust be increased.

 Ne

v

er increase suction gas pipe and HP/LP gas pipe siz

es

.

Depending on the length of the piping, the capacity ma

y drop

, b

ut e

v

en in such a case it is possib

le to 

increase the siz

e of the main pipes

.

Note 2

Allo

w

a

b

le length after the first refr

iger

ant br

anch kit to indoor units is 40 m or less

, ho

w

e

v

er it can be e

xtended up to 90 m i

f all the f

ollo

wing conditions are fulfilled.

Required conditions

Example dra

wings

It is necessar

y to increase the pipe siz

e betw

een the first br

anch kit and the final br

anch kit.

 (Reducers 

m

ust be procured on site

.) Ho

w

e

v

e

r,

 if the pipes are of the same pipe siz

e as the main pipe there is no 

need to increase the pipe siz

e

.

indoor unit 

8

b+c+d+e+f+g+p

90 m

increase the pipe siz

of b

, c

, d, e

, f

, g

Increase the pipe siz

e as f

ollo

ws

* If a

v

ailab

le on the site

. Otherwise it can not be increased.

F

or calculation of total e

xtension length, the actual length of abo

v

e

 pipes m

ust be doub

led.

 (e

xcept main 

pipe and the pipes that not increase the pipe siz

e)

a+b*2+c*2+d*2+e*2+f*2+g*2 

+h+i+j+k+l+m+n+p

1000 m

Indoor unit to the nearest br

anch kit 

40 m

h, i, j.......

 p

40 m

The diff

erence betw

een the distance of the outdoor unit to the f

a

rthest indoor unit and the distance of the 

outdoor unit to the nearest indoor unit 

40 m

The most remote indoor unit 

8

The nearest indoor unit 

1

(a+b+c+d+e+f+g+p)–(a+h)

40 m

C

A

B

E

F

C

C

D

D

F

The refr

iger

ant charge of the system m

ust be less than 

100 kg.

 This means that in case the calculated 

refr

iger

ant charge is equal to or more than 95 

kg y

ou 

m

ust divide y

our m

ultiple outdoor system into smaller 

independent systems

, each containing less than 95 kg 

refr

iger

ant charge

F

or f

actor

y charge

, ref

er to the unit name plate

.

REYQ

18~20 hp

22~24 hp

26 hp

28~30 hp

32~40 hp

42 hp

44~46 hp

48 hp

18~32 hp

34~48 hp

           B

>100%

  

120% 

0.5 

kg

>120%

130%

 

0.5 

kg

>100%

 

120%

 

0.5 

kg

>120%

130% 

1.0 

kg

[(X

1

 x 

Ø22.2

) x0.37] + [(X

2

 x 

Ø19.1

) x0.26] +

[(X

3

 x 

Ø15.9

) x0.18] + [(X

4

 x 

Ø12.7

) x0.12] +

[(X

5

 x 

Ø9.5

) x0.059] + [(X

6

 x 

Ø6.4

) x0.022]

+ A + B

x 1.02

REYQ

  A

1.0 

kg

1.5 

kg

2.0 

kg

2.5 

kg

3.0 

kg

3.5 

kg

4.0 

kg

4.5 

kg

X

1...6

 = 

T

otal length (m) of liquid piping siz

e at 

Øa

A

 = 

W

eight according to tab

le A

B

 = 

W

eight according to tab

le B:

 Indoor connection r

atio

R

 = [50x0.26]+[1x0.18]+[3x0.12]+[156x0.059]+[20x0.022]x1.02

+3.0+0.5

a :

 Ø19.1x30 

m

b :

 Ø19.1x20 

m

c :

 Ø9.5x10 

m

f :

 Ø9.5x10 

m

g :

 Ø9.5x10 

m

h :

 Ø9.5x10 

m

k :

 Ø9.5x20 

m

l :

 Ø9.5x20 

m

p :

 Ø6.4x10 

m

r :

 12.7x3 

m

m:

 Ø9.5x20 m

s

 : Ø9.5x3 m

u :

 Ø15.9x1 

m

d :

 Ø9.5x10 

m

e :

 Ø9.5x10 

m

i :

 Ø9.5x10 

m

j :

 Ø9.5x10 

m

: Ø9.5x10 m

: Ø9.5x3 m

o :

 Ø6.4x10 

m

= 27.148  

⇒ 

R = 27.1 kg

8~10

12~16

9.5 

 12.7

12.7 

 15.9

18~24

26~48

15.9 

 19.1

19.1 

 22.2

REYQ

Ø

REYQ

Ø

1

6

2

5
4

3

1

Outdoor unit

4

First refr

iger

ant 

br

anch kit

2

Main pipes

3

Increase only liquid 

pipe siz

e

5

BS unit

6

Indoor unit

Ø9.5

Ø12.7

Ø15.9

Ø19.1

Ø22.2

Ø25.4*

Ø34.9

Ø38.1*

Ø12.7

Ø15.9

Ø19.1

Ø22.2

Ø28.6

Ø31.8*

ab

c

d

e

f

g

H1

p

AB

C

D

E

F

G

12

3

4

5

6

7

8

H2

hi

j

k

l

m

n

1

2

3

1

Outdoor unit

2

Refnet joints (a~g)

3

Indoor units (1~8)

Summary of Contents for VRV III REMQ8P7Y1B

Page 1: ...INSTALLATION MANUAL REMQ8P7Y1B REMQ10P7Y1B REMQ12P7Y1B REMQ14P7Y1B REMQ16P7Y1B System air conditioner...

Page 2: ...b 300 mm c 10 mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b 300 mm e 400 mm A B C D A...

Page 3: ...0 mm 500 mm 1 1 1 A B 2 2 2 6 7 3 8 F1 F2 F1 F2 Q1 Q2 F1 F1 F2 F2 Q1Q2 F1 F2F1F2 7 TOIN DUNIT TOOUT DUNIT TOMULTIUNIT A1P Q1 Q2 A1P Q1 Q2 A1P F1 F2F1F2 TO IN D UNIT TO OUT D UNIT TO IN D UNIT TO OUT D...

Page 4: ...konstrukce A a pozitivn zji t no B v souladu s osv d en m C jak bylo uvedeno v souboru technick konstrukce D a pozitivn zji t no E pou it modul F G Kategorie rizik H Viz tak n sleduj c strana 15 kako...

Page 5: ...Smin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana P bar Izgatavo anas numurs...

Page 6: ...be combined with Daikin VRV indoor units for air conditioning purposes suitable for R410A The present installation manual describes the procedures for unpacking installing and connecting the REMQ P un...

Page 7: ...10 REYQ30 REMQ14 REMQ16 375 975 REYQ32 REMQ16 REMQ16 400 1040 REYQ34 REMQ8 REMQ10 REMQ16 425 1105 REYQ36 REMQ8 REMQ12 REMQ16 450 1170 REYQ38 REMQ10 REMQ12 REMQ16 475 1235 REYQ40 REMQ12 REMQ12 REMQ16 5...

Page 8: ...ncentration from exceeding allowable safety limits in the event of a refrigerant leak 11 To prevent dripping water to form a puddle underneath the unit install a drain pan available as option kit Make...

Page 9: ...f the foundation must at least be 150 mm from the floor The unit must be installed on a solid longitudinal foundation steelbeam frame or concrete and make sure the base under the unit is larger than t...

Page 10: ...st be installed by a licensed refrigeration technician and must comply with relevant local and national regulations Caution to be taken when brazing refrigerant piping Do not use flux when brazing cop...

Page 11: ...you remove the burrs and paint the edges and areas around the edges using repair paint to prevent rusting When passing electrical wiring through the knockout holes wrap the wiring with protective tape...

Page 12: ...hibited patterns change to pattern 1 or 2 To avoid the risk of oil retention to the outmost outdoor unit always connect the stop valve and the piping between outdoor units as shown in the 4 correct po...

Page 13: ...to malfunction of the outdoor unit 5 Piping length restrictions Make sure to perform the piping installation within the range of the maximum allowable pipe length allowable level difference and allowa...

Page 14: ...m n p 40 m Example unit 8 o 40 m Outdoor unit multi connection piping kit and refrigerant branch kit selection How to select the refnet joint When using refnet joints at the first branch counted from...

Page 15: ...r more the size of the main pipes of the liquid side must be increased Never increase suction gas pipe and HP LP gas pipe sizes Depending on the length of the piping the capacity may drop but even in...

Page 16: ...p valve 10 Liquid line stop valve 11 Refrigerant charge port 12 Valve A 13 Valve B 14 Valve C 15 To BS box or indoor unit 16 Stop valve 17 Service port 18 Field piping 19 Gas flow NOTE Make sure to pe...

Page 17: ...id H E liquid suction liquid R10 Resistor current sensor A4P A8P R31T R33T Thermistor discharge M1C M3C R50 R59 Resistor R90 Resistor current sensor R95 Resistor current limiting S1NPH Pressure sensor...

Page 18: ...grounding Be sure to install an earth leakage breaker One that can handle high frequency electrical noise This unit uses an inverter which means that an earth leakage breaker capable of handling high...

Page 19: ...box lid 2 Power wiring and ground wiring between outdoor units inside conduit When the wiring is routed out through the lateral panel 3 Transmission wiring 4 Pipe opening 5 Conduit 6 Power wiring and...

Page 20: ...from cutting the wires 1 Outdoor unit 2 Indoor unit 3 Main line 4 Branch line 1 5 Branch line 2 6 Branch line 3 7 No branch is allowed after branch A Transmission wiring between outdoor unit and indo...

Page 21: ...page 5 The electrical work 1 Make sure there is no faulty power wiring or loose nuts See 8 Field wiring on page 11 2 Make sure there is no faulty transmission wiring or loose nuts See 8 Field wiring o...

Page 22: ...e above Refrigerant cannot be charged until all field wiring and field piping has been completed Refrigerant may only be charged after performing the leak test and the vacuum drying The refrigerant ch...

Page 23: ...H1P x OFF BS1 MODE BS1 MODE BS2 SET BS2 SET BS3 RETURN BS1 MODE Adding refrigerant using the automatic refrigerant charging function is recommended When charging a system charging over the permissibl...

Page 24: ...e in heating mode to increase the indoor temperature The unit will automatically select the cooling mode or heating mode for charging Outdoor temperature 0 C DB 43 C DB Indoor temperature 10 C DB 32 C...

Page 25: ...lay on page 21 8 Operation When the following LED display is shown open valve A and close the front panel If the front panel is left open the system can not operate properly during the refrigerant cha...

Page 26: ...a multi system shows which unit is the master unit w slave 1 unit c or slave 2 unit x Only the master unit is connected to the indoor units with interunit wiring c x x w x x x x w Slave unit 1 a c x...

Page 27: ...ake sure to re attach the inspection cover 1 into the switch box cover 2 after the job is finished WARNING ELECTRIC SHOCK Caution when performing service to inverter equipment 1 Do not open the electr...

Page 28: ...or field setting For field setting For test operation For resetting the address when the wiring is changed or when an additional indoor unit is installed LED display Default status before delivery Mic...

Page 29: ...ed indoor units Be sure to turn on the power 6 hours before operation in order to have power running to the crank case heater and to protect the compressor 3 Make the field setting as described in the...

Page 30: ...to ON The indoor unit BS unit and the outdoor unit expansion valves will fully open The H1P LED is on and the remote controller indicates test operation and external control and the operation will be...

Page 31: ...s the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calculations in steps 1 and 2 above If the result of...

Page 32: ...NOTES NOTES...

Page 33: ...2 13 14 15 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 23 18 9 8 1 2 4 3 5 13 14 15 10 7 12 19 2 1 24 6 11 16 17 15 6 5 10 11 12 7 4 9 16 17 3 8 13 14 2 2 1 1 9 22 23...

Page 34: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW37156 1...

Reviews: