6
|
Before operation
Installer and user reference guide
22
BS4~12A14AJV1B
VRV 5 branch selector unit
4P695527-1 – 2022.02
6 Before operation
CAUTION
See
16] to acknowledge all related safety instructions.
NOTICE
NEVER inspect or service the unit by yourself. Ask a qualified service person to
perform this work.
NOTICE
Turn ON the power 6 hours before operation in order to have power running to the
crankcase heater and to protect the compressor.
This operation manual is for the following systems with standard control. Before
initiating operation, contact your dealer for the operation that corresponds to your
system type and mark. If your installation has a customised control system, ask
your dealer for the operation that corresponds to your system.