![background image](http://html1.mh-extra.com/html/daikin/vam350j8veb/vam350j8veb_service-manual_3760821099.webp)
5
|
Technical data
Service manual
99
VAM350~200 EKVDX32~100A2VEB
VRV system air conditioner
ESIE22-07 – 2022.02
Example
Setting the central control group number 2-05 to 1:
Use the local setting on the controller to set the central control group number.
Mode number: 00
Central control group number: 2-05
Zone control
F1 F2
F1 F2
F1 F2
F1 F2
F1 F2
P1 P2
P1
P2
P1 P2
P1
P2
VAM 1
VAM 2
VAM 3
VRV
c
a
b
a
2
1
1
Zone 1
2
Zone 2
a
Controller for air conditioner
b
Maximum length of connection line: 1000 m
c
Central controller (DCS302C51 or DCS601C51 or DCM601A51)
VAM 1
VAM heat reclaim ventilation unit 1
VAM 2
VAM heat reclaim ventilation unit 2
VAM 3
VAM heat reclaim ventilation unit 3
VRV
VRV indoor unit
▪
Up to 64 units, a combination of air conditioners and VAM units, can be
connected to the F1 and F2 terminals.
▪
Zone 1 and 2 can be controlled independently with the central controller.
Zone 2
The VAM units operate in the zone-linked mode, as described in
95].
Initial settings:
▪
A central control group number must be assigned to each VAM unit and air
conditioner. See "The central control group number setting" in
98] for information about setting the group number.
draft – 07/02/2022 15:12