![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-flks25bavmb/super-multi-nx-flks25bavmb_service-manual_4200790125.webp)
SiBE05-722EE
Trial Operation and Field Settings
115
Part 7
Trial Operation and
Field Settings
Pump Down Operation .........................................................................116
Forced Cooling Operation ....................................................................116
2. Trial Operation ....................................................................................118
3. Field Settings ......................................................................................119
When 2 Units are Installed in 1 Room..................................................119
Facility Setting Jumper (cooling at low outdoor temperature) ..............120
Jumper and Switch Settings.................................................................121
4. Silicone Grease on Power Transistor / Diode Bridge..........................122