![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-flks25bavmb/super-multi-nx-flks25bavmb_service-manual_4200790005.webp)
SiBE05-722EE
Table of Contents
iv
5.12 Main Circuit Short Check......................................................................110
5.13 Power Module Check ...........................................................................112
Part 7 Trial Operation and Field Settings................................. 115
Pump Down Operation .........................................................................116
Forced Cooling Operation ....................................................................116
2. Trial Operation ....................................................................................118
3. Field Settings ......................................................................................119
When 2 Units are Installed in 1 Room..................................................119
Facility Setting Jumper (cooling at low outdoor temperature) ..............120
Jumper and Switch Settings.................................................................121
4. Silicone Grease on Power Transistor / Diode Bridge..........................122
Part 8 Appendix.........................................................................123