15. Test operation

15.1. Pre-run checks

Be sure to perform a test run.

Be sure to fully open the liquid-side and gas-side stop valves. If 
you operate the unit with stop valves closed, the compressor will 
break down.

Be sure to execute the first test run of the installation in cooling 
mode operation.

Never leave the unit unattended with an open front panel during 
test run.

15.2. Remote controller confirmation

The settings of the remote controller for the BRC1E52 series 
should be made in accordance with procedure 

15.3.

The settings of the remote controller for the BRC1E51 series 
should be made in accordance with the procedure mentioned in 
the remote controller installation manual.

The settings of the remote controller for the BRC1D series 
should be made in accordance with the procedure mentioned in 
the service manual.

15.3. Test run

1

Be sure to turn power on at least 6 hours before starting 
operation in order to protect the compressor.

2

Make sure the liquid and gas stop valves are open.

3

Be sure to close the frontside panel before operation, as not 
doing so can cause electric shock.

4

Be sure to set the unit to cooling operation mode.

DANGER

Never leave the unit unattended during installation or 
servicing. When the service panel is removed live parts 
can be easily touched by accident.

INFORMATION

Note that during the first running period of the unit, 
required power input may be higher than stated on the 
nameplate of the unit. This phenomenon originates from 
the compressor that needs elapse of a 50 hours run in 
period before reaching smooth operation and stable power 
consumption.

Items to check

Electrical wiring

 

Inter-unit wiring

 

Ground wire

Is the wiring as mentioned on the wiring 
diagram?
Make sure no wiring has been forgotten and 
that there are no missing phases or reverse 
phases.

Is the unit properly grounded?

Is the wiring between units connected in 
series correct?

Are any of the wiring attachment screws 
loose?

Is the insulation resistance at least 1 M

?

- Use a 500 V mega-tester when 

measuring insulation.

- Do not use a mega-tester for low-voltage 

circuits.

Refrigerant 

piping

Is the size of the piping appropriate?

Is the insulation material for the piping 
attached securely?
Are both the liquid and gas pipes insulated?

Are the stop valves for both the liquid side 
and the gas side open?

Extra refrigerant

Did you write down the extra refrigerant and 
the refrigerant piping length?

NOTICE

Do not interrupt the test run.

NOTICE

The backlight will be lit for approximately 30 seconds 
by pressing any operation button.

Operate the buttons when the backlight is lit.

 

However, On/Off can be operated directly when the 
backlight is not lit.

5

Press and hold the 

Cancel

 button for 4 seconds or longer.

<Basic screen>

Press and hold the 

Cancel

 button for 

4 seconds or longer during backlight lit.

The Service Setting menu is displayed

6

Select 

Test operation

 in the Service Settings menu, and press 

the 

Menu/Enter

 button.

<Service Settings menu screen>

Press the 

Menu/Enter

 button.

The Basic screen returns and 

Test operation

 is displayed.

7

Press the 

ON/OFF

 button within ±10 seconds.

 

The test operation starts.

Press the 

ON/OFF

 button within 

±10 seconds.

Check operation condition for 3 minutes.

INFORMATION

In case the above mentioned procedures 5 and 6 are 
performed in reverse order, test operation can start as 
well.

A

B

Opening direction

A

Liquid side

B

Gas side

Remove the cap and turn 

 

counterclockwise with a 

 

hex wrench until it stops

Cool

Set to

Cool

28

°C

Return

Setting

Service Settings                   1/3

Test Operation

Maintenance Contact
Field Settings
Demand
Min Setpoints Differential
Group Address

Cool

Return

Setting

Test Operation

Summary of Contents for SkyAir RZQG140L7V1B

Page 1: ...L RZQG71L8V1B RZQG100L8V1B RZQG125L8V1B RZQG140L7V1B RZQG71L8Y1B RZQG100L8Y1B RZQG125L8Y1B RZQG140L7Y1B RZQSG100L8V1B RZQSG125L8V1B RZQSG140L7V1B RZQSG100L8Y1B RZQSG125L8Y1B RZQSG140L7Y1B Split system...

Page 2: ...A B 1 2 4 5 H1 L3 L2 L3 L4 L2 L3 L4 L5 L6 L7 A C E B D H 1 2 3 1 50 Hz 220 240 V 3N 50 Hz 380 415 V V1 type Y1 type 1 2 4 5 A 1 A 2 100 100 100 100 1 1 2 H1 H1 H1 H2 H2 H2 L1 L1 L1 L1 L2 7 R410A R410...

Page 3: ...o com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifikat C 11 Information enligt A och godk nts av B enligt Certifikatet C 12 Merk som det fremkommer...

Page 4: ...15 3 Test run 18 15 4 Precautions regarding test runs 19 15 5 Failure diagnosis at the moment of first installation 19 16 Wiring diagram 20 Thank you for purchasing this product The original instruct...

Page 5: ...an withstand its weight Insufficient strength may result in the fall of equipment and causing injury Carry out the specified installation work in consideration of strong winds typhoons or earthquakes...

Page 6: ...is advised to foresee a delay of 10 minutes for signalling the alarm in case the alarm temperature is exceeded The unit may stop for several minutes during normal operation for defrosting the unit or...

Page 7: ...or neighbours Safe places which can withstand the unit s weight and vibration and where the unit can be installed level Places where there is no possibility of flammable gas or product leak The equipm...

Page 8: ...tdoor unit In heavy snowfall areas it is very important to select an installation site where the snow will not affect the unit and set the outlet side at a right angle to the direction of the wind 6 P...

Page 9: ...let space position the units with consideration to the space required for the onsite refrigerant piping work as well Consult your dealer if the work conditions do not match those in the drawings 7 1 P...

Page 10: ...ion shall comply with applicable legislation In Europe the EN378 is the application standard that shall be used NOTICE To persons in charge of piping work Be sure to open the stop valve after piping i...

Page 11: ...el 71 100 125 140 Maximum total one way piping length a a Parenthesized figure represents the equivalent length Pair L1 size down 10 m 10 m standard 50 m 70 m 75 m 90 m size up 25 m 35 m 35 m 45 m Twi...

Page 12: ...se using existing piping with deteriorated oil will cause compressor breakdown Put some residual oil of the pipes you want to reuse on a piece of white paper or on the white surface of an oil checking...

Page 13: ...it will deteriorate the refrigerant oil 9 3 Stop valve operation Cautions on handling the stop valve Make sure to keep both stop valves open during operation The figure below shows the name of each pa...

Page 14: ...he edge and the surrounding end surfaces to prevent rusting When passing electrical wiring through the knock out holes remove any burrs from the knock out holes and wrap the wiring with protective tap...

Page 15: ...ks Use a 2 stage vacuum pump with a non return valve which can evacuate to a gauge pressure of 100 7 kPa 5 Torr absolute 755 mm Hg Connect the vacuum pump to both the service port of the gas stop valv...

Page 16: ...leak test and vacuum drying see 11 Leak test and vacuum drying on page 12 This unit requires additional charging of refrigerant according to the length of refrigerant piping connected at the site Mak...

Page 17: ...b G2 12 m 6 4 R2 0 6 kg 3 Refrigerant charge amount R R1 R2 0 5 0 6 1 1 kg Example 2 1 G1 L1 5 m G2 L2 L3 L4 17 17 20 54 2 Over 30 m a G1 5 m R1 0 0kg b G1 G2 30 5 54 30 29 6 4 R2 0 9 kg 3 Refrigerant...

Page 18: ...g on mode type RZQG71 RZQSG100 125 RZQG100 140 RZQSG140 Model Liquid piping Refrigerant piping length 5 10 m a b a For RZQG units only 3 10 m b For RZQG units only When piping length is less than 5 m...

Page 19: ...ring Secure the earth wire to the stop valve attachment plate so that it does not slide Secure the earth wire to the stop valve attachment plate one more time along with the electric wiring and the in...

Page 20: ...nsibility of the installer or user of the equipment to ensure by consultation with the distribution network operator if necessary that the equipment is connected only to a supply with a short circuit...

Page 21: ...wiring as mentioned on the wiring diagram Make sure no wiring has been forgotten and that there are no missing phases or reverse phases Is the unit properly grounded Is the wiring between units connec...

Page 22: ...or of this product only works during the initialisation stage after a power reset The reversed phase protection detector is designed to stop the product in case of an abnormality when the product is s...

Page 23: ...eat exchanger middle R6T Thermistor liquid R10T Thermistor fin RC V1B Signal receiver circuit S1PH High pressure switch TC V1B Signal transmission circuit V1R IGBT power module V1T V1B Insulated gate...

Page 24: ...4P339538 1A 2014 03 Copyright 2013 Daikin...

Reviews: