![background image](http://html1.mh-extra.com/html/daikin/skyair-gqi-eco-fcqg100eveb/skyair-gqi-eco-fcqg100eveb_installation-manual_2460091018.webp)
16
English
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
CAUTION
•
Electrical wiring work should be done by a certified electrician.
•
If someone who does not have the proper qualifications performs the work, perform the following after the
test run is complete.
•
Remove the control box lid. Connect the single phase power supply (SINGLE PHASE 50Hz 220-240V,
60Hz 220V) to connections No.1 and No.2 on the terminal block for wiring the units. Do not connect to No.3
of the terminal block for wiring the units. (The drain pump will not operate.) Connect the earth wire firmly.
When carrying out wiring work around the control box, make sure none of the connectors come undone. Be
sure to attach the control box lid before turning on the power.
•
Put approximately 1L of water slowly into the drain pan through the outlet on the left side of the drain socket.
Make sure not to pour water over the drain pump or any electric parts including those of the drain pump.
•
When the power is turned on, the drain pump will operate and you can check the draining of water through
the transparent part of the drain socket. (The drain pump will stop automatically in 10 minutes.)
After checking the drainage of water, wrap the sealing pad (14) to the drain socket so that thermal insulate
the drain socket.
•
After confirming drainage
(Fig. 25, Fig. 26)
, turn off the power and remove the power supply.
•
Attach the control box lid as before.
Summary of Contents for SkyAir GQI-Eco FCQG100EVEB
Page 2: ......
Page 32: ...1008 FS 3P177351 3J EM10A017...