background image

6 Commissioning

Installation manual

19

RZAG71~Y1
Sky Air Alpha-series
4P695306-1 – 2022.05

5.6

Finishing the outdoor unit
installation

5.6.1

To finish the outdoor unit installation

1

Insulate and fix the refrigerant piping and cables as follows:

g

b

a

f

e

c

d

a

Gas pipe

b

Gas pipe insulation

c

Interconnection cable

d

Field wiring (if applicable)

e

Liquid pipe

f

Liquid pipe insulation

g

Finishing tape

2

Install the service cover.

5.6.2

To check the insulation resistance of the
compressor

NOTICE

If,  after  installation,  refrigerant  accumulates  in  the
compressor,  the  insulation  resistance  over  the  poles  can
drop,  but  if  it  is  at  least  1  MΩ,  then  the  unit  will  not  break
down.

▪ Use a 500 V mega-tester when measuring insulation.

▪ Do NOT use a mega-tester for low voltage circuits.

1

Measure the insulation resistance over the poles.

If

Then

≥1 MΩ

Insulation resistance is OK. This procedure
is finished.

<1 MΩ

Insulation resistance is not OK. Go to the
next step.

2

Turn ON the power and leave it on for 6 hours.

Result: 

The  compressor  will  heat  up  and  evaporate  any

refrigerant in the compressor.

3

Measure the insulation resistance again.

6

Commissioning

Please  provide  the  eco  design  data  according  to  (EU)2016/2281  to
the customer. This data can be found in the installer reference guide
or via the Daikin website.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

6.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

In case a wireless user interface is used: The 

indoor unit

decoration panel

 with infrared receiver is installed.

The 

outdoor unit

 is properly mounted.

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between the outdoor unit and the indoor unit (master)

▪ Between the indoor units

There are NO 

missing phases

 or 

reversed phases

.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

6.2

To perform a test run

This  task  is  only  applicable  when  using  the  BRC1E52  or  BRC1E53
user  interface.  When  using  any  other  user  interface,  see  the
installation manual or service manual of the user interface.

NOTICE

Do NOT interrupt the test run.

INFORMATION

Backlight.

  To  perform  an  ON/OFF  action  on  the  user

interface,  the  backlight  does  not  need  to  be  lit.  For  any
other  action,  it  needs  to  be  lit  first.  The  backlight  is  lit  for
±30 seconds when you press a button.

1

Perform introductory steps.

#

Action

1

Open the liquid stop valve and gas stop valve by
removing the cap and turning counterclockwise with a
hex wrench until it stops.

2

Close the service cover to prevent electric shocks.

3

Turn ON power for at least 6 hours before starting
operation to protect the compressor.

4

On the user interface, set the unit to cooling operation
mode.

2

Start the test run

#

Action

Result

1

Go to the home menu.

Cool

Set to

28

°C

Summary of Contents for Sky Air Alpha RZAG100N2V1B

Page 1: ...Installation manual Sky Air Alpha series English Installation manual Sky Air Alpha series RZAG71N2V1B RZAG100N2V1B RZAG125N2V1B RZAG140N2V1B RZAG71N2Y1B RZAG100N2Y1B RZAG125N2Y1B RZAG140N2Y1B...

Page 2: ...HD HU 200 1000 1000 500 HD HU A B C 200 1 300 1000 A B C E 200 1 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 250 1500 300 1500 B D E HB HU 300 1000 1000 500 HU HB HU 300 1250 1000 50...

Page 3: ...na f r i henhold til bestemmelsene i noudattaen s nn ksi za dodr en ustanoven prema odredbama k veti a z zgodnie z postanowieniami urm nd prevederile 19 20 21 22 23 24 25 v skladu z dolo bami vastaval...

Page 4: ...la TS TSmin Alhaisin matalapainepuolen l mp tila L C TSmax Suurinta sallittua painetta PS vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuos...

Page 5: ...e Equipment Safety Regulations 2016 S I 2008 1597 Supply of Machinery Safety Regulations 2008 S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 1091 Electromagnetic Compatibility Reg...

Page 6: ...th the maximum allowable pressure PS M C Refrigerant N Setting of pressure safety device P bar Manufacturing number and manufacturing year refer to model nameplate K L M TSmin TSmax PS N P 41 5 30 70...

Page 7: ...iring diagram Outdoor unit 22 1 About this document Target audience Authorised installers INFORMATION This appliance is intended to be used by expert or trained users in shops in light industry and on...

Page 8: ...installations NEVER install a drier to this unit to guarantee its lifetime The drying material may dissolve and damage the system CAUTION Install the refrigerant piping or components in a position whe...

Page 9: ...ion MUST comply with the applicable legislation WARNING If the supply cord is damaged it MUST be replaced by the manufacturer its service agent or similarly qualified persons in order to avoid a hazar...

Page 10: ...of the front cover INFORMATION The sound pressure level is less than 70 dBA CAUTION Appliance NOT accessible to the general public Install it in a secured area protected from easy access This unit is...

Page 11: ...usting NOTICE Precautions when making knockout holes Avoid damaging the casing and underlying piping After making the knockout holes we recommend to remove the burrs and paint the edges and areas arou...

Page 12: ...vent damage 3 Do the following Connect the liquid pipe a to the liquid stop valve Connect the gas pipe b to the gas stop valve a b 4 Do the following Insulate the liquid piping a and the gas piping b...

Page 13: ...stop valve to increase efficiency Make sure that the gas stop valve and liquid stop valve are firmly closed before performing the leak test or vacuum drying 1 Vacuum the system until the pressure on t...

Page 14: ...ve with service port gas Typical workflow Completely recharging refrigerant typically consists of the following stages 1 Determining how much refrigerant to charge 2 Charging refrigerant 3 Filling in...

Page 15: ...0 7 1 05 a 1 4 a a Only for RZAG100 140 To determine the additional refrigerant amount R in kg in case of twin triple and double twin 1 Determine G1 and G2 G1 m Total length of x liquid piping x 9 5 m...

Page 16: ...sh buttons BS on the PCB A1P and reading the feedback from the 7 segment displays Operate the switches and push buttons with an insulated stick such as a closed ball point pen to avoid touching of liv...

Page 17: ...ended to foresee a delay of 10 minutes for signalling the alarm in case the alarm temperature is exceeded The unit may stop for several minutes during normal operation for defrosting the unit or when...

Page 18: ...the wiring to the frame at the knockout hole Routing through the frame Choose one of the 3 possibilities a a a 2 3 1 a Power supply cable Note Route the interconnection cable together with the refrige...

Page 19: ...unit decoration panel with infrared receiver is installed The outdoor unit is properly mounted The following field wiring has been carried out according to this document and the applicable legislatio...

Page 20: ...e Nothing displayed the currently set temperature is not displayed The wiring is disconnected or there is a wiring error between power supply and outdoor unit between outdoor unit and indoor units bet...

Page 21: ...space between the unit and obstacles A B C D and E eB Maximum distance between the unit and the edge of obstacle E in the direction of obstacle B eD Maximum distance between the unit and the edge of...

Page 22: ...t Layout Front Front Back Back Position of compressor terminal Position of compressor terminal 3 Notes English Translation Notes Notes Connection X1M Indoor outdoor communication Earth wiring Field su...

Page 23: ...only Resistor R1T Thermistor air R2T Thermistor discharge R3T Thermistor suction R4T Thermistor heat exchanger R5T Thermistor heat exchanger middle R6T Thermistor liquid R7T Thermistor fin R8 A1P V1 o...

Page 24: ...4P695306 1 2022 05 Copyright 2022 Daikin 4P695306 1 0000000R Verantwortung f r Energie und Umwelt...

Reviews: