8

Cautions for necessity of a trap

Since there is fear of the oil held inside the riser piping flowing back into
the compressor when stopped and causing liquid compression
phenomenon, or cases of deterioration of oil return, it will be necessary
to provide a trap at an appropriate place in the riser gas piping.

Trap installation spacing. 

(See figure 3)

A

Outdoor unit

B

Indoor unit

C

Gas piping

D

Liquid piping

E

Oiltrap

H

Install trap at each difference in height of 10 m.

A trap is not necessary when the outdoor unit is installed in a
higher position than the indoor unit.

Cautions for brazing

Be sure to carry out a nitrogen blow when brazing.
Brazing without carrying out nitrogen replacement or releasing
nitrogen into the piping will create large quantities of oxidised
film on the inside of the pipes, adversely affecting valves and
compressors in the refrigerating system and preventing normal
operation. When brazing pipes however, do not use oxidation
preventers. Residue of such preventers may result in choking of
pipes or malfunction of components.

When brazing while inserting nitrogen into the piping, nitrogen
must be set to 0.02 MPa with a pressure-reducing valve (=just
enough so that it can be felt on the skin).

E

VACUATING

Do not purge the air with refrigerants. Use a vacuum pump to
vacuum the installation. No additional refrigerant is provided for
air purging.

Pipes inside the units were checked for leaks by the
manufacturer. The refrigerant pipes fit on site are to be checked
for leaks by the installer.

Confirm that the valves are firmly closed before leak test or
vacuuming.

Set up for vacuuming and leak test: 

see 

figure 5

Procedure for leak test

Leak test must satisfy EN378-2.

1

Evacuate the pipes and check vacuum

(1)

. (No pressure increase

for 1 minute.)

2

Break the vacuum with a minimum of 2 bar of nitrogen. (Never
pressurize more than 4.0 MPa.)

3

Conduct leak test by applying soap water, etc. to the connecting
part of the pipes.

4

Discharge nitrogen.

5

Evacuate and check vacuum again

(1)

.

6

If the vacuum gauge no longer rises, the stop valves can be
opened.

1

Refrigerant piping

2

Part to be brazed

3

Taping

4

Hands valve

5

Pressure-reducing valve

6

Nitrogen

1

2

3

4

5

6

6

1

Pressure gauge

2

Nitrogen

3

Refrigerant

4

Weighing machine

5

Vacuum pump

6

Stop valve

(1) Use a 2-stage vacuum pump with a non return valve which 

can evacuate to –100.7 kPa (5 Torr, –755 mm Hg).
Evacuate the system from the liquid and gas pipes by using 
a vacuum pump for more than 2 hours and bring the system 
to –100.7 kPa. After keeping the system under that condition 
for more than one hour, check if the vacuum gauge rises or 
not. If it rises, the system may either contain moisture inside 
or have leaks.

Following should be executed if there is a possibility of
moisture remaining in the pipe (if piping work is carried out
during the raining season or over a long period of time,
rainwater may enter the pipe during work).
After evacuating the system for 2 hours, pressurize the
system to 0.05 MPa (vacuum break) with nitrogen gas and
evacuate the system again using the vacuum pump for
1 hour to –100.7 kPa (vacuum drying). If the system
cannot be evacuated to –100.7 kPa within 2 hours, repeat
the operation of vacuum break and vacuum drying. Then
after leaving the system in vacuum for 1 hour, confirm that
the vacuum gauge does not rise.

After air purging with a vacuum pump it may happen that
the refrigerant pressure does not rise, not even if the stop
valve is opened. Reason for this phenomenon is the closed
state of for instance the expansion valve in the outdoor unit
circuit, but this is not a problem for running the unit.

Summary of Contents for Siesta AZQS71A2V1B

Page 1: ...INSTALLATION MANUAL AZQS71A2V1B AZQS100A7V1B AZQS125A7V1B AZQS140A7V1B AZQS100A7W1B AZQS125A7W1B AZQS140A7W1B Split System air conditioners...

Page 2: ...0 Hz 220 240 V R410A 1 2 4 5 6 3 1 3 2 4 5 A B A E B C D H H1 L1 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L...

Page 3: ...positivamente da B secondo il Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurder...

Page 4: ...lation work may result in accidents due to fall of equipment Make certain that all electrical work is carried out by qualified personnel according to the local laws and regulations and this installati...

Page 5: ...els of salt such as that near the ocean Where voltage fluctuates a lot such as that in factories In vehicles or vessels Where acidic or alkaline vapour is present Provide a logbook In accordance with...

Page 6: ...trong wind blows continuously on the face of the unit the fan can start rotating very fast until it breaks Refer to the figures for installation of this unit in a place where the wind direction can be...

Page 7: ...pe disposal from the outdoor unit causes trouble for example if the drain water may splash on people provide the drain piping using a drain socket optional Make sure the drain works properly INSTALLAT...

Page 8: ...L H 0 L 1 2H 150 250 1 2H L 200 300 H L Installation impossible Installation shall be done by a licensed refrigeration technician the choice of materials and installation shall comply with the applic...

Page 9: ...pair paint to the edge and the surrounding end surfaces to prevent rusting Preventing foreign objects from entering Plug the pipe through holes with putty or insulating material procured locally to st...

Page 10: ...ing material If the temperature is higher than 30 C and the humidity is higher than RH 80 then the thickness of the sealing materials should be at least 20 mm in order to avoid condensation on the sur...

Page 11: ...edure for leak test Leak test must satisfy EN378 2 1 Evacuate the pipes and check vacuum 1 No pressure increase for 1 minute 2 Break the vacuum with a minimum of 2 bar of nitrogen Never pressurize mor...

Page 12: ...relate to the refrigerant piping length as in Maximum total one way piping length of the table in paragraph Allowable pipe length and height difference on page 5 Table 2 Total charging amount unit kg...

Page 13: ...ide Make sure no external pressure is applied to the terminal connectors When installing the earth leakage breaker make sure that it is compatible with the inverter resistant to high frequency electri...

Page 14: ...asons be sure to observe the following instruction Do not connect wires of different gauge to the same power supply terminal Looseness in the connection may cause overheating When connecting wires of...

Page 15: ...e unit returns to normal operation 10 Check all functions according to the operation manual AZQS 71V1 100V1 125V1 140V1 100W1 125W1 140W1 Minimum circuit amps MCA a a Stated values are maximum values...

Page 16: ...ay have run out If the remote controller shows E3 E4 or L8 as an error code there is a possibility that either the stop valves are closed or that air inlet or air outlet are blocked If the error code...

Page 17: ...r discharge for V1 models only R3T Thermistor discharge pipe for W1 models only R3T Thermistor suction pipe for V1 models only R4T Thermistor suction pipe for W1 models only R4T Thermistor coil for V1...

Page 18: ......

Page 19: ......

Page 20: ...4PW68422 1 03 2011 Copyright 2011 Daikin...

Reviews: