• If there is no torque wrench, use
Table 4
as a rule of thumb.
When tightening a flare nut with a spanner harder and harder, there is a point where the tightening torque
suddenly increases.
From that position, tighten the nut additionally the angle shown in
Table 4.
After the work is finished, check securely that there is no gas leak.
If the nut is not tightened as instructed, it may cause slow refrigerant leak and result in malfunction
(such as does not cool or heat).
Table 4
Piping size (mm)
Tightening angle
Recommended arm length of tool used
<I> 6.4
60
°
-90
°
approx. 150 mm
cp9.5
60
°
-90
°
approx. 200 mm
cp 12.7
30
°
-60
°
approx. 250 mm
cp 15.9
30
°
-60
°
approx. 300 mm
-&
CAUTION
Insulation of field piping must be carried out up to the connection inside the casing.
If the piping is exposed to the atmosphere, it may cause sweating, burn due to touching the piping,
electric shocks or a fire due to the wiring touching the piping.
• After leak test, referring to
Fig. 16,
insulate both the gas and liquid piping connection with the attached
joint insulating for fitting (6) and (7) to prevent the pipings from getting exposed.
Then, tighten the both ends of insulating material with the clamp.
• Wrap the sealing material (Medium-1, 2) ( 9 ) ( 10) around the joint insulating for fitting (6) and (7)
(flare nut section), both the gas and liquid piping.
• Make sure to bring the seam of joint insulating for fitting (6) and (7) to the top.
Gas Piping Insulation Procedure
Insulation for fitting (8)
(accessory)
- - - - - - -
� Piping insulation
Flare nut connection
material (main unit)
Turn seams up
Attach to base
Piping insulation - - - -
---c-r�,-------y,,
Main unit
=>
material
(Field supply)
Do not expose the piping
in order to prevent the
vapor condensation
Tighten the part other
than the piping insulation
material.
Liquid Piping Insulation Procedure
Insulation for fitting (9)
(accessory)
Piping insulation
Flare nut connection material (main unit)
Turn seams up
Piping insulation
material
(Field supply)
�ttach to base I
\
Do not expose the piping
in order to prevent the
vapor condensation
Tighten the part other
than the piping insulation
material.
47
Wrap over from the
base of the unit to
the top of the flare
nut connection.
Sealing pad
medium-1 (9)
(accessory)
Wrap the
insulator around
the part from the
root.
Sealing pad
medium-2 (1 0)
(accessory)
Screw mounting part
of piping presser plate
(2 locations)
Fig.16
I
Summary of Contents for RZVFQ50
Page 1: ...1...
Page 2: ...2...
Page 3: ...3...
Page 4: ...4...
Page 5: ...5...
Page 6: ...6...
Page 7: ...7...
Page 8: ...8...
Page 9: ...9...
Page 10: ...10...
Page 11: ...111...
Page 12: ...12...
Page 13: ...13...
Page 14: ...14...
Page 15: ...15...
Page 16: ...16...
Page 18: ...18 18 20 20 21 24 24 27 28 29 32 33...
Page 19: ...19...
Page 20: ...20...
Page 21: ...21...
Page 22: ...22...
Page 23: ...23...
Page 24: ...24...
Page 25: ...25...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 72: ...72 72 74 75 75 75 75 76 77 79 80...
Page 73: ...73...
Page 74: ...74...
Page 75: ...75...
Page 76: ...76 77 77...
Page 77: ...77...
Page 78: ...78...
Page 79: ...79 77...
Page 80: ...80 77 77 75 75...
Page 81: ...81...