Trial Operation and Testing

1.

Trial operation and testing

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

For heat pump

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable 

temperature.
1) Trial operation may be disabled in either mode depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C in cooling mode, 20

°

C to 24

°

C in 

heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

For cooling only

• Select the lowest programmable temperature.

1) Trial operation in cooling mode may be disabled depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts, 

such as louver movement, are working properly.

• The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2.

Test items

Test items

Symptom

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating 
function

Refrigerant gas and liquid pipes and indoor drain hose extension are 
thermally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for inter-unit wiring.

Inoperative or burn damage

Indoor or outdoor unit’s air inlet or outlet has clear path of air.
Stop valves are opened.

Incomplete cooling/heating 
function

Indoor unit properly receives remote control commands.

Inoperative

01_EN_3P203824-8H.fm  Page 11  Tuesday, October 26, 2010  8:33 PM

Summary of Contents for RXS20J2V1B

Page 1: ...ion manual R410A Split series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de...

Page 2: ...e 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64564 12E Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N4 09 2010 RXS20J2V1B RXS25J2V1B RXS35J2V1B RKS20J2V1B RKS25J2V1B RKS3...

Page 3: ...ls If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for refrige...

Page 4: ...8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit a...

Page 5: ...necting the FVXS indoor unit the shortest piping length should be no less than around 2 5m 1 5m Min allowable length CAUTION Set the piping length from 1 5m to 20m Wrap the insulation pipe with the fi...

Page 6: ...door Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necess...

Page 7: ...re nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches Cut exactl...

Page 8: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 9: ...on dimensions as below 3 Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation O D 9 5mm O D 6 4mm...

Page 10: ...turned off Turn it off if has not been turned off 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn on the main power supply CAUTION Before conne...

Page 11: ...ing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock After closing the liquid stop valve close the gas stop valve within 3 minutes then stop the fo...

Page 12: ...supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due to unavoidable r...

Page 13: ...tion in accordance with the operation manual to ensure that all functions and parts such as louver movement are working properly The air conditioner requires a small amount of power in its standby mod...

Page 14: ...1101 HT 3P203824 8H M09B389 Two dimensional bar code is a code for manufacturing 00_CV_3P203824 8H fm Page 2 Thursday October 7 2010 11 00 AM...

Reviews: