background image

English

10

 CAUTION

When connecting the connection wires to the terminal board using a single core wire, be sure to perform curling.
Problems with the work may cause heat and fires.

3) Pull the wire and make sure that it does not disconnect. Then fix the wire in place with a wire stop.

Strip wire end
to this point.

Excessive strip length
may cause electrical
shock or leakage.

Good

Wrong

Stripping wire at terminal block

01_EN_3P182455-1.fm  Page 10  Wednesday, May 17, 2006  5:37 PM

Summary of Contents for RXS20E2V1B

Page 1: ...iano Portugues T rk e Installation manual R410A Split series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding...

Page 2: ...EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TC...

Page 3: ...on may cause terminal overheating electrical shock or fire If any refrigerant has leaked out during the installation work ventilate the room The refrigerant produces a toxic gas if exposed to flames A...

Page 4: ...n if they are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9...

Page 5: ...Allow space for piping and electrical servicing 250mm from wall unit mm O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additionl refrigerant required...

Page 6: ...oundation surface Outdoor Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Draw ings 2 I...

Page 7: ...m fully with the torque wrenches Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and escaping gas 2 To prevent gas leakage apply refrigeration machine oil on bot...

Page 8: ...om gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no oper...

Page 9: ...l copper pipes and fittings observe the following 1 Insulation material Polyethylene foam Heat transfer rate 0 041 to 0 052W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reach...

Page 10: ...30 minutes To force a test run to stop press the operation stop button CAUTION 1 When pressing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock 2...

Page 11: ...e terminal screws securely We recommend a flathead screwdriver be used to tighten the screws The screws are packed with the terminal board Observe the notes mentioned below when wiring to the power su...

Page 12: ...sure to perform curling Problems with the work may cause heat and fires 3 Pull the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop Strip wire end to this poi...

Page 13: ...ion for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts such as louver movement are working properly Th...

Page 14: ...0607 HT 3P182455 1 M06B005...

Reviews: