background image

11

English

Test Run and Final Check

1.

Trial operation and testing.

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

For heat pump

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temper-

ature.
1) Trial operation may be disabled in either mode depending on the room temperature.

Use the remote control for trial operation as described below.

2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C in cooling mode, 20

°

C to 24

°

C in 

heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

For cooling only

• Select the lowest programmable temperature.

1) Trial operation in cooling mode may be disabled depending on the room temperature.

Use the remote control for trial operation as described below.

2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C).

3) For protection, the unit disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts, 

such as louver movement, are working properly.

• The air conditioner requires a small amount of power in its standby mode.  If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2.

Test items.

Test items

Symptom

(diagnostic display on RC)

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating function

Refrigerant gas and liquid pipes and indoor drain hose extension are thermally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for interconnecting wire connections.

Inoperative or burn damage

Indoor or outdoor unit’s air intake or exhaust has clear path of air.
Stop valves are opened.

Incomplete cooling/heating function

Indoor unit properly receives remote control commands.

Inoperative

01_EN_3P182455-1.fm  Page 11  Wednesday, May 17, 2006  5:37 PM

Summary of Contents for RXS20E2V1B

Page 1: ...iano Portugues T rk e Installation manual R410A Split series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding...

Page 2: ...EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TC...

Page 3: ...on may cause terminal overheating electrical shock or fire If any refrigerant has leaked out during the installation work ventilate the room The refrigerant produces a toxic gas if exposed to flames A...

Page 4: ...n if they are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9...

Page 5: ...Allow space for piping and electrical servicing 250mm from wall unit mm O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additionl refrigerant required...

Page 6: ...oundation surface Outdoor Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Draw ings 2 I...

Page 7: ...m fully with the torque wrenches Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and escaping gas 2 To prevent gas leakage apply refrigeration machine oil on bot...

Page 8: ...om gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no oper...

Page 9: ...l copper pipes and fittings observe the following 1 Insulation material Polyethylene foam Heat transfer rate 0 041 to 0 052W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reach...

Page 10: ...30 minutes To force a test run to stop press the operation stop button CAUTION 1 When pressing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock 2...

Page 11: ...e terminal screws securely We recommend a flathead screwdriver be used to tighten the screws The screws are packed with the terminal board Observe the notes mentioned below when wiring to the power su...

Page 12: ...sure to perform curling Problems with the work may cause heat and fires 3 Pull the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop Strip wire end to this poi...

Page 13: ...ion for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts such as louver movement are working properly Th...

Page 14: ...0607 HT 3P182455 1 M06B005...