10.4.1 General guidelines
N
10.4.2 Installation of refrigerant piping, leak test, vacuuming
before electrical installation is done (regular installation
method)
N
N
N
N
N
N
N
10.4.3 Installation of refrigerant piping, leak test, vacuuming
after electrical installation is done on any indoor or
outdoor unit
N
N
N
N
N
N
N
N
N
NOTICE
NOTICE
N
N
NOTICE
N
N
N
10.4.4 Setup
1
2
3
4
N
5
6
7
8
T
9
10
11
12
13
1
15
16
4
A
B
C
Which valves?
State of valves
N
TT
1
2
3
4
5
6
A
B
C
9
8
7
10
10
10
11
14
15
16
12
13
NOTICE
N
N
N
10.4 Leak test and vacuum drying
N
N
N
N
N
N
N
Summary of Contents for RXQ10AYM
Page 12: ......
Page 28: ...1 T 2 3 4 5 6 NOTICE N 1 2 3 4 5 RXQ6 12 N N N N 8 2 1 6 7 6 6 4 5 4 3 3 6 ...
Page 38: ...Value 2 11 Meaning Level N N N 5 15 2 Mode 2 95 95 5 Value 2 8 Te target 95 95 1 1 N N ...
Page 39: ...959 5 N N 959 1 5 959 9 5 3 3 9 5 9 1 95 9 N 3 3 9 9 9 3 9 3 ...
Page 50: ...5 1 7 RLQW UDQFK LW 53 7 53 7 C D3K05234B Unit mm Unit mm ...
Page 51: ... 53 7 53 7 C D3K05236B Unit mm Unit mm ...
Page 52: ... 53 7 53 7 53 7 53 7 ...
Page 53: ......
Page 56: ... 53 0 53 0 53 0 53 0 ...
Page 57: ......
Page 58: ...5HGXFHU 53 0 73 53 0 3 ...
Page 59: ...2XWGRRU 8QLW 0XOWL RQQHFWLRQ 3LSLQJ LW 3 3 3D052312 Unit mm Gas side Unit mm Liquid side ...
Page 60: ... 3 3 3D052314 Unit mm Gas side Unit mm Liquid side ...
Page 61: ... 3 3 3 3 ...
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ...5 4 0 5 4 0 5 4 0 5 4 0 ...
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ...5 4 0 5 4 0 5 4 0 5 4 0 ...
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......