background image

5 Piping installation

Installation manual

9

(A)RXP20~35N5V1B
R32 split series
3P650253-10H – 2022.10

5

Piping installation

5.1

Preparing refrigerant piping

5.1.1

Refrigerant piping requirements

Piping material:

 phosphoric acid deoxidised seamless copper

Piping diameter:

Liquid piping

Ø6.4 mm (1/4")

Gas piping

Ø9.5 mm (3/8")

Piping temper grade and thickness:

Outer diameter

(Ø)

Temper grade

Thickness (t)

(a)

6.4 mm (1/4")

Annealed (O)

≥0.8 mm

t

Ø

9.5 mm (3/8")

Annealed (O)

(a)

Depending on the applicable legislation and the maximum
working pressure of the unit (see "PS High" on the unit name
plate), larger piping thickness might be required.

5.1.2

Refrigerant piping length and height
difference

What?

Distance

Maximum allowable pipe length

20 m

Minimum allowable pipe length

1.5 m

Maximum allowable height difference

12 m

5.1.3

Refrigerant piping insulation

▪ Use polyethylene foam as insulation material:

▪ with a heat transfer rate between 0.041 and 0.052 W/mK (0.035

and 0.045 kcal/mh°C)

▪ with a heat resistance of at least 120°C

▪ Insulation thickness

Pipe outer diameter

p

)

Insulation inner

diameter (Ø

i

)

Insulation thickness

(t)

6.4 mm (1/4")

8~10 mm

≥10 mm

9.5 mm (3/8")

12~15 mm

Ø

i

Ø

i

t

Ø

p

Ø

p

If  the  temperature  is  higher  than  30°C  and  the  humidity  is  higher
than RH 80%, the thickness of the insulation materials should be at
least  20  mm  to  prevent  condensation  on  the  surface  of  the
insulation.

5.2

Connecting the refrigerant piping

DANGER: RISK OF BURNING/SCALDING

5.2.1

About connecting the refrigerant piping

Before connecting the refrigerant piping

Make sure the outdoor and indoor unit are mounted.

Typical workflow

Connecting the refrigerant piping involves:

▪ Connecting the refrigerant piping to the indoor unit

▪ Connecting the refrigerant piping to the outdoor unit

▪ Insulating the refrigerant piping

▪ Keeping in mind the guidelines for:

▪ Pipe bending

▪ Flaring pipe ends

▪ Using the stop valves

5.2.2

Precautions when connecting the
refrigerant piping

DANGER: RISK OF BURNING/SCALDING

NOTICE

▪ Use the flare nut fixed to the main unit.

▪ To  prevent  gas  leakage,  apply  refrigeration  oil  only  to

the  inside  of  the  flare.  Use  refrigeration  oil  for  R32
(

Example: 

 FW68DA).

▪ Do NOT reuse joints.

WARNING

Connect the refrigerant piping securely before running the
compressor. If the refrigerant piping is NOT connected and
the stop valve is open when the compressor is run, air will
be  sucked  in.  This  will  cause  abnormal  pressure  in  the
refrigeration cycle, which may result in equipment damage
and even injury.

5.2.3

To connect the refrigerant piping to the
outdoor unit

Piping length.

 Keep field piping as short as possible.

Piping  protection.

  Protect  the  field  piping  against  physical

damage.

1

Connect the liquid refrigerant connection from the indoor unit to
the liquid stop valve of the outdoor unit.

a

c b

a

Liquid stop valve

b

Gas stop valve

c

Service port

2

Connect  the  gas  refrigerant  connection  from  the  indoor  unit  to
the gas stop valve of the outdoor unit.

NOTICE

It  is  recommended  that  the  refrigerant  piping  between
indoor  and  outdoor  unit  is  installed  in  a  ducting  or  the
refrigerant piping is wrapped with finishing tape.

5.3

Checking the refrigerant piping

5.3.1

To check for leaks

NOTICE

Do NOT exceed the unit's maximum working pressure (see
"PS High" on the unit name plate).

Summary of Contents for RXP20N5V1B

Page 1: ...Installation manual R32 split series English Installation manual R32 split series RXP20N5V1B RXP25N5V1B RXP35N5V1B ARXP20N5V1B ARXP25N5V1B ARXP35N5V1B...

Page 2: ...sploatuojami laikantis m s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpisom mi z...

Page 3: ...accordance with our instructions as amended S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 1091 Electromagnetic Compatibility Regulations 2016 S I 2008 1597 Supply of Machinery Sa...

Page 4: ...cal data 14 12 1 Wiring diagram 14 12 1 1 Unified wiring diagram legend 14 12 2 Piping diagram 16 12 2 1 Piping diagram Outdoor unit 16 1 About the documentation 1 1 About this document WARNING Make s...

Page 5: ...n This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Incomplete flaring may cause refrigerant gas leakage Do NOT re use flares Us...

Page 6: ...l insulation as such pipes will be very hot DANGER RISK OF ELECTROCUTION All electrical parts including thermistors are powered by the power supply Do NOT touch them with bare hands DANGER RISK OF ELE...

Page 7: ...installation servicing maintenance and repair comply with instructions from Daikin and with applicable legislation and are executed ONLY by authorised persons 4 1 1 Installation site requirements of t...

Page 8: ...a 100 mm above expected level of snow 4 2 2 To install the outdoor unit 4 M8 M10 4 2 3 To provide drainage NOTICE If the unit is installed in a cold climate take adequate measures so that the evacuat...

Page 9: ...sure the outdoor and indoor unit are mounted Typical workflow Connecting the refrigerant piping involves Connecting the refrigerant piping to the indoor unit Connecting the refrigerant piping to the...

Page 10: ...harging additional refrigerant make sure the outdoor unit s external refrigerant piping is checked leak test vacuum drying INFORMATION Depending on the units and or the installation conditions it migh...

Page 11: ...ying 1 Connect the refrigerant cylinder to the service port 2 Charge the additional refrigerant amount 3 Open the gas stop valve 6 6 To fix the fluorinated greenhouse gases label 1 Fill in the label a...

Page 12: ...220 240 V Recommended field fuse 16 A Earth leakage circuit breaker MUST comply with applicable legislation 7 2 To connect the electrical wiring to the outdoor unit 1 Remove the service cover 2 Open...

Page 13: ...run is finished set the temperature to a normal level In cooling mode 26 28 C in heating mode 20 24 C 3 The system stops operating 3 minutes after the unit is turned OFF INFORMATION Even if the unit i...

Page 14: ...tor D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Connector frame ground H Harness H P LED V L Pilot lamp light emitting diode S...

Page 15: ...llation manual 15 A RXP20 35N5V1B R32 split series 3P650253 10H 2022 10 Symbol Meaning X M Terminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve coil Z C Ferrite co...

Page 16: ...T 7 0CuT 9 5CuT M 6 4CuT 6 4CuT 4 8CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT Propeller fan 9 5CuT 9 5CuT 7 0CuT g2 g1 f f c a b d j l k g3 i e RXP20N RXP25N ARXP20N ARXP25N h 7 0CuT 7 0CuT...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 10H 2022 10 Copyright 2...

Reviews: