Installation manual

R32 split series

English

Installation manual

R32 split series

RXP20M5V1B
RXP25M5V1B
RXP35M5V1B

ARXP20M5V1B
ARXP25M5V1B
ARXP35M5V1B

Summary of Contents for RXP20M5V1B

Page 1: ...Installation manual R32 split series English Installation manual R32 split series RXP20M5V1B RXP25M5V1B RXP35M5V1B ARXP20M5V1B ARXP25M5V1B ARXP35M5V1B...

Page 2: ...nka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad ja lietoti atbilsto i ra ot ja nor d jumiem atbilst sekojo iem standartiem un citi...

Page 3: ...un 12 10 4 Starting up the outdoor unit 12 11 Disposal 12 11 1 Overview Disposal 12 11 2 To pump down 12 11 3 To start and stop forced cooling 13 11 3 1 To start and stop forced cooling using the indo...

Page 4: ...NGER RISK OF ELECTROCUTION WARNING ALWAYS use multicore cable for power supply cables WARNING All wiring MUST be performed by an authorised electrician and MUST comply with the applicable legislation...

Page 5: ...r intrinsically safe Prior to and during work the area MUST be checked with an appropriate refrigerant detector capable of detecting R32 refrigerant to ensure a work environment free of refrigerant WA...

Page 6: ...ed to wind It is recommended to install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind b a b c a Baffle plate b Prevailing wind direction c Air outlet 4 1 2 A...

Page 7: ...lable options contact your dealer 1 Use a drain plug for drainage 2 Use a 16 mm hose field supply b c d a a Drain port b Bottom frame c Drain plug accessory d Hose field supply NOTICE Provide at least...

Page 8: ...Make sure the outdoor and indoor unit are mounted Typical workflow Connecting the refrigerant piping involves Connecting the refrigerant piping to the indoor unit Connecting the refrigerant piping to...

Page 9: ...e charging additional refrigerant make sure the outdoor unit s external refrigerant piping is checked leak test vacuum drying INFORMATION Depending on the units and or the installation conditions it m...

Page 10: ...um drying 1 Connect the refrigerant cylinder to the service port 2 Charge the additional refrigerant amount 3 Open the gas stop valve 6 6 To fix the fluorinated greenhouse gases label 1 Fill in the la...

Page 11: ...or unit installation 1 Insulate and fix the refrigerant piping and cables as follows g b a f e c d a Gas pipe b Gas pipe insulation c Interconnection cable d Field wiring if applicable e Liquid pipe f...

Page 12: ...turned OFF INFORMATION Even if the unit is turned OFF it consumes electricity When the power turns back on after a power break the previously selected mode will be resumed 10 4 Starting up the outdoor...

Page 13: ...nt on the indoor unit Method 2 Using the indoor unit user interface 11 3 1 To start and stop forced cooling using the indoor unit ON OFF switch 1 Press the ON OFF switch for at least 5 seconds Result...

Page 14: ...HN HR MR _A MR _B S U V W X A K R_ NE Connection connector D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Connector frame ground...

Page 15: ...0253 6E 2022 04 Symbol Meaning V R Diode bridge Insulated gate bipolar transistor IGBT power module WRC Wireless remote controller X Terminal X M Terminal strip block Y E Electronic expansion valve co...

Page 16: ...f c a b d j l k g3 i e RXP20M RXP25M RXP35M ARXP20M ARXP25M ARXP35M h a Liquid field piping h Heat exchanger thermistor b Gas field piping i 4 way valve ON heating c Liquid stop valve j Muffler d Gas...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 6E 2022 04 Copyright 20...