Trial Operation and Testing

1.

Trial operation and testing

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

For heat pump

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable 

temperature.
1) Trial operation may be disabled in either mode depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C in cooling mode, 20

°

C to 24

°

C in 

heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

For cooling only

• Select the lowest programmable temperature.

1) Trial operation in cooling mode may be disabled depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts, 

such as louver movement, are working properly.

• The air conditioner requires a small amount of power in its standby mode.  If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2.

Test items 

Test items

Symptom

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating 
function

Refrigerant gas and liquid pipes and indoor drain hose extension are 
thermally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for inter-unit wiring.

Inoperative or burn damage

Indoor or outdoor unit’s air inlet or air outlet has clear path of air.
Stop valves are opened.

Incomplete cooling/heating 
function

Indoor unit properly receives remote control commands.

Inoperative

Summary of Contents for RXLG50L2V1B

Page 1: ...INSTALLATION MANUAL R410A Split Series MODEL RXLG50L2V1B RXL50K2V1B RXL50J3V1B RXLG50K3V1B...

Page 2: ...y es valorado positivamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo l Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o pa...

Page 3: ...A y es valorado positivamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo l Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o p...

Page 4: ...blece en A y es valorado positivamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo l Certificato C 07 A B C 08 Nota tal como estabelecido em A...

Page 5: ...abnormal heat build up or fire When wiring the power supply and connecting the wiring between the indoor and outdoor units position the wires so that the control box lid can be securely fastened Impr...

Page 6: ...ot place under the unit anything which must be kept away from moisture NOTE Cannot be installed hanging from ceiling or stacked CAUTION When operating the air conditioner in a low outdoor ambient temp...

Page 7: ...leveled Otherwise water leakage or pooling of water may occur Foot bolt hole centres 580mm 120mm From unit s side Max allowable height Min allowable length Max allowable length 20m 1 5m 15m Liquid pi...

Page 8: ...fix the unit securely by means of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bol...

Page 9: ...torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fu...

Page 10: ...n side of charging hose which comes from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressu...

Page 11: ...ng and to provide insulation dimensions as below 3 Use separate thermal insulation for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation...

Page 12: ...imately 15 minutes To stop the operation press the switch SW1 Wiring WARNING Do not use tapped wires stranded wires extension cords or starburst connections as they may cause overheating electrical sh...

Page 13: ...terminals on the wires up to the covered part and secure in place Ground terminal installation Use the following method when installing the round crimp style terminal CAUTION When connecting the conne...

Page 14: ...PAN HEATER Drain pan heater C7 C8 Capacitor DB1 DB3 Diode bridge FU1 FU2 FU3 FU4 FU5 Fuse FU6 Field fuse IPM Intelligent power module L Live L803 L804 Reactor M1C Compressor motor M1F Fan motor MRCW...

Page 15: ...1 3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts such as louver movement are working properly The air conditioner requires a small amoun...

Page 16: ...3P327449 5H 2013 12 Copyright 2013 Daikin...

Reviews: