background image

English

11

Wiring

Wiring diagram

For applied parts and numbering refer to the wiring diagram sticker supplied on the unit. Part numbering is realized by Arabic numbers in ascending order for each part and 

is represented in the overview below by symbol “*” in the part code.

:

CONNECTION

:

PROTECTIVE EARTH (SCREW)

,

:

CONNECTOR

:

RECTIFIER

:

EARTH

:

RELAY CONNECTOR

:

FIELD WIRING

:

SHORT CIRCUIT CONNECTOR

䣋䣐䣆䣑䣑䣔

:

INDOOR UNIT

:

TERMINAL

䣑䣗䣖䣆䣑䣑䣔

:

OUTDOOR UNIT

:

TERMINAL STRIP

:

PROTECTIVE EARTH

:

WIRE CLAMP

BLK

:

BLACK

GRN

:

GREEN

PNK

:

PINK

WHT

:

WHITE

BLU

:

BLUE

GRY

:

GREY

PRP, PPL

:

PURPLE

YLW

:

YELLOW

BRN

:

BROWN

ORG

:

ORANGE

RED

:

RED

A*P

:

PRINTED CIRCUIT BOARD

PTC*

:

THERMISTOR PTC

BS*

:

PUSH BUTTON ON / OFF, OPERATION SWITCH

Q*

:

INSULATED GATE BIPOLAR TRANSISTOR (IGBT)

BZ, H*O

:

BUZZER

Q*DI

:

EARTH LEAK CIRCUIT BREAKER

C*

:

CAPACITOR

Q*L

:

OVERLOAD PROTECTOR

CN*, E*AC*, HA*, HE, HL*, HN*, 
HR*, MR*_A, MR*_B, S*, X*A

:

CONNECTION, CONNECTOR

Q*M

:

THERMO SWITCH

D*, V*D

:

DIODE

R*

:

RESISTOR

DB*

:

DIODE BRIDGE

R*T

:

THERMISTOR

DS*

:

DIP SWITCH

RC

:

RECEIVER

E*H

:

HEATER

S*C

:

LIMIT SWITCH

F*U, FU* 

(FOR CHARACTERISTICS 

REFER TO PCB INSIDE YOUR UNIT)

:

FUSE S*L

:

FLOAT 

SWITCH

FG*

:

CONNECTOR (FRAME GROUND)

S*NPH

:

PRESSURE SENSOR (HIGH)

H*

:

HARNESS

S*NPL

:

PRESSURE SENSOR (LOW)

H*P, LED*, V*L

:

PILOT LAMP, LIGHT EMITTING DIODE

S*PH, HPS*

:

PRESSURE SWITCH (HIGH)

HAP

:

LIGHT EMITTING DIODE (SERVICE MONITOR GREEN)

S*PL

:

PRESSURE SWITCH (LOW)

IES

:

INTELLIGENT EYE SENSOR

S*T

:

THERMOSTAT

IPM*

:

INTELLIGENT POWER MODULE

S*W, SW*

:

OPERATION SWITCH

K*R, KCR, KFR, KHuR

:

MAGNETIC RELAY

SA*

:

SURGE ARRESTOR

L

:

LIVE

SR*, WLU

:

SIGNAL RECEIVER

L*

:

COIL

SS*

:

SELECTOR SWITCH

L*R

:

REACTOR

SHEET METAL

:

TERMINAL STRIP FIXED PLATE

M*

:

STEPPER MOTOR

T*R

:

TRANSFORMER

M*C

:

COMPRESSOR MOTOR

TC, TRC

:

TRANSMITTER

M*F

:

FAN MOTOR

V*, R*V

:

VARISTOR

M*P

:

DRAIN PUMP MOTOR

V*R

:

DIODE BRIDGE

M*S

:

SWING MOTOR

WRC

:

WIRELESS REMOTE CONTROLLER

MR*, MRCW*, MRM*, MRN* 

:

MAGNETIC RELAY

X*

:

TERMINAL

N

:

NEUTRAL

X*M

:

TERMINAL STRIP (BLOCK)

PAM

:

PULSE-AMPLITUDE MODULATION

Y*E

:

ELECTRONIC EXPANSION VALVE COIL

PCB*

:

PRINTED CIRCUIT BOARD

Y*R, Y*S

:

REVERSING SOLENOID VALVE COIL

PM*

:

POWER MODULE

Z*C

:

FERRITE CORE

PS

:

SWITCHING POWER SUPPLY

ZF, Z*F

:

NOISE FILTER

Summary of Contents for RXJ20M2V1B

Page 1: ...INSTALLATION MANUAL R32 Split Series Models RXJ20M2V1B RXJ25M2V1B RXJ35M2V1B RXM20M2V1B RXM25M2V1B RXM35M2V1B ARXM25M2V1B ARXM35M2V1B...

Page 2: ...amente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B d...

Page 3: ...ion lead as this may cause overheating electric shocks or fire Make sure that all wiring is secured the specified wires are used and that there is no strain on the terminal connections or wires Improp...

Page 4: ...be installed hanging from ceiling or stacked CAUTION Do not install the air conditioner at any place where there is a danger of flammable gas leakage In the event of a gas leakage build up of gas nea...

Page 5: ...ion side facing the wall Never install the outdoor unit at a site where the suction side may be exposed directly to wind To prevent exposure to wind it is recommended to install a baffle plate on the...

Page 6: ...nger of the unit falling use foot bolts or wires 250mm from wall unit mm How to remove the stop valve cover Remove the screw on the stop valve cover Slide the cover downward to remove it How to attach...

Page 7: ...e foundation surface Outdoor Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2...

Page 8: ...age to the flare nuts and gas leakage After the piping work is finished after checking for gas leaks open the stop valves or the compressor might break down Align the centres of both flares and tighte...

Page 9: ...is necessary to evacuate the air and check for gas leakage If using additional refrigerant perform air evacuating from the refrigerant pipes and indoor unit using a vacuum pump then charge additional...

Page 10: ...y water off 7 Disconnect charging hose from gas stop valve s service port then fully open liquid and gas stop valves Do not attempt to turn valve rod beyond its stop 8 Tighten valve caps and service p...

Page 11: ...losing the liquid stop valve close the gas stop valve within 3 minutes then stop the forced cooling operation Facility Setting cooling at low outdoor temperature This function is designed for faciliti...

Page 12: ...nal block Observe the notes mentioned below when wiring to the power supply terminal block Precautions to be taken for power supply wiring CAUTION When connecting the connection wires to the terminal...

Page 13: ...RMISTOR DS DIPSWITCH RC RECEIVER E H HEATER S C LIMITSWITCH F U FU FORCHARACTERISTICS REFERTOPCBINSIDEYOURUNIT FUSE S L FLOATSWITCH FG CONNECTOR FRAMEGROUND S NPH PRESSURESENSOR HIGH H HARNESS S NPL P...

Page 14: ...a small amount of power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit brea...

Page 15: ......

Page 16: ...3P386697 2C 2015 10 Copyright 2015 Daikin...

Reviews: