6 Installation

Installer reference guide

16

RXF50+60B2_RXF71A2_RXP50~71L2_(A)RXM42~71N2_RXJ50N2_

RXA42+50B2

R32 split series

4P513661-6B – 2018.05

i

h

j

a

b

c

h

k

d

f

f

e

g

a

Low pressure gauge

b

Gauge manifold

c

High pressure gauge

d

Low-pressure valve (Lo)

e

High-pressure valve (Hi)

f

Charging hoses

g

Vacuum pump

h

Valve caps

i

Service port

j

Gas stop valve

k

Liquid stop valve

1

Vacuum the system until the pressure on the manifold indicates
−0.1 MPa (−1 bar).

2

Leave as is for 4-5 minutes and check the pressure:

If the pressure…

Then…

Does not change

There is no moisture in the
system. This procedure is
finished.

Increases

There is moisture in the
system. Go to the next step.

3

Vacuum the system for at least 2 hours to a manifold pressure
of −0.1 MPa (−1 bar).

4

After  turning  the  pump  OFF,  check  the  pressure  for  at  least
1 hour.

5

If  you  do  NOT  reach  the  target  vacuum  or  CANNOT  maintain
the vacuum for 1 hour, do the following:

▪ Check for leaks again.
▪ Perform vacuum drying again.

NOTICE

Make  sure  to  open  the  stop  valves  after  installing  the
refrigerant  piping  and  performing  vacuum  drying.  Running
the  system  with  the  stop  valves  closed  may  break  the
compressor.

INFORMATION

After opening the stop valve, it is possible that the pressure
in the refrigerant piping does NOT increase. This might be
caused  by  e.g.  the  closed  state  of  the  expansion  valve  in
the outdoor unit circuit, but does NOT present any problem
for correct operation of the unit.

6.6

Charging refrigerant

6.6.1

About charging refrigerant

The  outdoor  unit  is  factory  charged  with  refrigerant,  but  in  some
cases the following might be necessary:

What

When

Charging additional refrigerant

When the total liquid piping
length is more than specified
(see later).

Completely recharging refrigerant

Example: 

▪ When relocating the system.

▪ After a leak.

Charging additional refrigerant

Before  charging  additional  refrigerant,  make  sure  the  outdoor  unit's

external

 refrigerant piping is checked (leak test, vacuum drying).

INFORMATION

Depending on the units and/or the installation conditions, it
might be necessary to connect electrical wiring before you
can charge refrigerant.

Typical  workflow  –  Charging  additional  refrigerant  typically  consists
of the following stages:

1 Determining if and how much you have to charge additionally.

2 If necessary, charging additional refrigerant.

3 Filling in the fluorinated greenhouse gases label, and fixing it to

the inside of the outdoor unit.

Completely recharging refrigerant

Before completely recharging refrigerant, make sure the following is
done:

1 All refrigerant is recovered from the system.

2 The outdoor unit's 

external

 refrigerant piping is checked (leak

test, vacuum drying).

3 Vacuum drying on the outdoor unit's 

internal

 refrigerant piping is

performed.

NOTICE

Before  completely  recharging,  perform  vacuum  drying  on
the outdoor unit's 

internal

 refrigerant piping as well.

Typical  workflow  –  Completely  recharging  refrigerant  typically
consists of the following stages:

1 Determining how much refrigerant to charge.

2 Charging refrigerant.

3 Filling in the fluorinated greenhouse gases label, and fixing it to

the inside of the outdoor unit.

6.6.2

About the refrigerant

This  product  contains  fluorinated  greenhouse  gases.  Do  NOT  vent
gases into the atmosphere.

Refrigerant type: R32

Global warming potential (GWP) value: 675

WARNING: FLAMMABLE MATERIAL

The refrigerant inside this unit is mildly flammable.

WARNING

The  appliance  shall  be  stored  in  a  room  without
continuously  operating  ignition  sources  (example:  open
flames, an operating gas appliance or an operating electric
heater).

Summary of Contents for RXF60B2V1B

Page 1: ...e R32 split series English Installer reference guide R32 split series RXF50B2V1B RXF60B2V1B RXF71A2V1B RXP50L2V1B RXP60L2V1B RXP71L2V1B ARXM50N2V1B RXM42N2V1B RXM50N2V1B RXM60N2V1B RXM71N2V1B RXJ50N2V...

Page 2: ...refrigerant piping 15 6 5 3 To check for leaks 15 6 5 4 To perform vacuum drying 15 6 6 Charging refrigerant 16 6 6 1 About charging refrigerant 16 6 6 2 About the refrigerant 16 6 6 3 Precautions whe...

Page 3: ...accessories optional equipment and spare parts made or approved by Daikin WARNING Make sure installation testing and applied materials comply with applicable legislation on top of the instructions de...

Page 4: ...slation for example national gas regulation and are executed only by authorised persons Installation space requirements NOTICE Pipework shall be protected from physical damage Installation of pipework...

Page 5: ...ant gas leaks ventilate the area immediately Possible risks Excessive refrigerant concentrations in a closed room can lead to oxygen deficiency Toxic gas may be produced if refrigerant gas comes into...

Page 6: ...nder overvoltage category III condition MUST be installed in the fixed wiring WARNING ONLY use copper wires Make sure the field wiring complies with the applicable legislation All field wiring MUST be...

Page 7: ...re installing About the documentation What documentation exists for the installer About the box How to unpack the units and remove their accessories About the unit How to identify the unit Preparation...

Page 8: ...it is mildly flammable 4 1 Overview About the unit This chapter contains information about Identification of the outdoor unit 4 2 Identification NOTICE When installing or servicing several units at th...

Page 9: ...a Air outlet b Air inlet NOTICE The height of the wall on the outlet side of the outdoor unit MUST be 1200 mm NOTICE Do NOT stack the units on each other Do NOT hang the unit on a ceiling Strong winds...

Page 10: ...hat the heat exchanger coil is NOT affected by the snow If necessary install a snow cover or shed and a pedestal 5 3 Preparing refrigerant piping 5 3 1 Refrigerant piping requirements INFORMATION Also...

Page 11: ...stallation 6 1 Overview Installation This chapter describes what you have to do and know on site to install the system Typical workflow Installation typically consists of the following stages 1 Openin...

Page 12: ...tall the unit on a frame install a waterproof plate within 150 mm of the bottom side of the unit in order to prevent water from getting into the unit and to avoid drain water dripping see the followin...

Page 13: ...piping into account Avoid anything but the designated refrigerant to get mixed into the refrigerant cycle e g air Only use R32 when adding refrigerant Only use installation tools e g manifold gauge se...

Page 14: ...a b c a Flare s inner surface MUST be flawless b The pipe end MUST be evenly flared in a perfect circle c Make sure the flare nut is fitted 6 4 6 Using the stop valve and service port CAUTION Do NOT...

Page 15: ...f the following stages 1 Checking for leaks in the refrigerant piping 2 Performing vacuum drying to remove all moisture air or nitrogen from the refrigerant piping If there is a possibility of moistur...

Page 16: ...gth is more than specified see later Completely recharging refrigerant Example When relocating the system After a leak Charging additional refrigerant Before charging additional refrigerant make sure...

Page 17: ...ective gloves and safety glasses CAUTION To avoid compressor breakdown do NOT charge more than the specified amount of refrigerant Prerequisite Before charging refrigerant make sure the refrigerant pi...

Page 18: ...s DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes and measure the voltage at the terminals of main circuit capacitors or electrical components before servicing The vo...

Page 19: ...en the wire clamp 4 Connect the interconnection cable and power supply as follows 50 Hz 220 240 V c d f a b e a Interconnection cable b Power supply cable c Field fuse d Earth leakage circuit breaker...

Page 20: ...st speed Do NOT use this setting in residences or offices with people 7 2 Standby electricity saving function 7 2 1 About the standby electricity saving function This mode turns OFF the power supply o...

Page 21: ...issioning To perform an air purge To perform a test run 8 5 To perform a test run Prerequisite Power supply MUST be in the specified range Prerequisite Test run may be performed in cooling or heating...

Page 22: ...d from the mains Turn off the respective circuit breaker When a safety device was activated stop the unit and find out why the safety device was activated before resetting it NEVER shunt safety device...

Page 23: ...top the compressor before removing the refrigerant piping If the compressor is still running and the stop valve is open during pump down air will be sucked into the system Compressor breakdown or dama...

Page 24: ...R HR MR _A MR _B S U V W X A K R_ D V D DIODE DB DIODE BRIDGE DS DIP SWITCH E H HEATER F U FU FOR CHARACTERISTICS FUSE REFER TO PCB INSIDE YOUR UNIT FG CONNECTOR FRAME GROUND H HARNESS H P LED V L PIL...

Page 25: ...tdoor temperature Thermistor Refrigerant flow Cooling Heating PED categories of equipment High pressure switch category IV Compressor category II Other equipment art 4 3 Applicable for RXP60L RXP71L R...

Page 26: ...ipment High pressure switch category IV Compressor category II Other equipment art 4 3 Applicable for RXM42N RXM50N RXM60N ARXM50N RXJ50N RXA42B RXA50B M HPS High pressure switch Automatic reset Heat...

Page 27: ...d maintain it Operation manual Instruction manual specified for a certain product or application explaining how to operate it Maintenance instructions Instruction manual specified for a certain produc...

Page 28: ...4P513661 6B 2018 05 Copyright 2018 Daikin...

Reviews: