1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Details
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
5. Attach the valve cap once procedures are complete.
Refer to Forced Cooling Operation on page 206 for details.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Summary of Contents for RX-W Series
Page 1: ... Applied Models Inverter Pair Heat Pump Service Manual SiUS092230EA Inverter Pair RX W Series ...
Page 207: ...SiUS092230EA Check Part 6 Service Diagnosis 201 15 18 24 class R25105 1 2 3 4 Multimeter ...
Page 209: ...SiUS092230EA Check Part 6 Service Diagnosis 203 15 18 24 class R20704 W V U DC_P1 DC_N1 ...
Page 239: ...SiUS092230EA Piping Diagrams Part 8 Appendix 233 RX24WMVJU9 3D141502 ...