SiE33-003
Index
i
Index
Symbols
“88” cannot be cleared
from the central remote control .....................122
A
Additional Charge of Refrigerant ......................34, 97
Additional Refrigerant Charge ..............................145
Additional Refrigerant Charge Operation ...............77
Air Tight Test ..........................................................27
Allowable Piping Length .........................................94
B
Brazing ...................................................................21
C
Centralized Control Group No. Setting ...................84
Changes Required by New Refrigerant ...............170
Checks before Initial Start-Up ..............................158
Code No. ................................................................82
Combination .........................................................126
Connecting the Refrigerant Piping .......................138
Control Modes ........................................................86
Control Wiring ........................................................47
Cool / Heat Mode Selection ...................................68
Cool/Heat Operation ............................................156
Cracks develop in field pipes
due to thermal expansion and contraction ....120
Cylinder Specifications .........................................174
D
Demand Control .....................................................74
Drain Pipe Gradient and Support ...........................36
Drain pipe trap shape defective ...........................117
Drain Pipe Work Indoor units .................................36
Drain Piping for Each Model
FXYCP-2-way blow ceiling mounted cassette .39
FXYFP-4-way blow ceiling mounted cassette .40
FXYKP-ceiling mounted corner cassette .........42
FXYSP-Concealed ceiling unit ........................45
Drain Trap ..............................................................36
E
Electrical Specifications .......................................131
Electrical Work .......................................................47
Excessive noise due to incorrect angling of
REFNET joints ..............................................119
F
Field Line Connection ..........................................153
Field Setting ...........................................................83
Field Wiring ..........................................................147
Flange Connection .................................................25
Flare Connection ....................................................22
Flaring Procedure ...................................................23
G
Gas Leaks ........................................................... 183
Gas Shortage ...................................................... 183
Grouped Drain Piping ............................................ 37
H
Hand Over to Customer ........................................ 91
Handling of Cylinders .......................................... 175
I
Indoor Field Setting ............................................... 79
Infrared Remote Control — Indoor Unit ................ 81
Installation ............................................................. 12
Installation of Indoor Unit ...................................... 14
Installation of Outdoor Unit .................................... 51
Internal Wiring ..................................................... 148
L
Leak Test ............................................................ 143
Low Noise Operation ............................................. 73
M
Main Components ............................................... 132
Measure for Gas Shortage .................................. 184
Mismatch between cables connecting indoor and
outdoor units and corresponding piping ....... 116
Misswiring Check Operation ............................... 162
Mode Change ........................................................ 61
Monitor Mode ........................................................ 66
N
New Tools Required
for HFCs and Reasons of Change ............... 177
O
Operating Noise of Indoor Units ............................ 92
Operation Guideline ............................................ 181
Operation Mode .................................................... 86
Operation When Power is Turned On ................... 58
Optional Accessories .......................................... 129
Optional Parts Cool/Heat Selector ...................... 150
P
PC Board Ass’y
Outdoor Unit ................................................... 59
Picking Power Line and Transmission Line ........ 157
Pipe Insulation ..................................................... 144
PIPE SIZE REDUCER ........................................ 103
Piping Diameter for Grouped Drain Pipes ............. 38
Piping Kits for Side and Bottom Piping ............... 104
Piping System Diagrams
Indoor Unit .................................................... 110
Outdoor Unit ................................................. 111
Power Circuit and Cable Requirements .............. 151
Power Supply ........................................................ 48
Si33-003.book Page i Monday, June 25, 2001 9:06 AM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html