![background image](http://html1.mh-extra.com/html/daikin/rk15kevm/rk15kevm_removal-procedure_2459827015.webp)
Si001159
Removal of Electrical Box / PCBs
Removal Procedure
13
6
Lift and remove the
electrical box.
4. Remove the control PCB.
1
Disconnect the 2
terminals of the reactor.
2
Pull out the terminals
from the terminal board.
Step
Procedure
Points
Electrical box
(R14802)
(R14803)
Reactor
Brown
White
Control PCB
Terminal board
(R14804)