![background image](http://html2.mh-extra.com/html/daikin/rebel-dps-series/rebel-dps-series_installation-and-maintenance-manual_5691598009.webp)
Figure 4: Roof Curb Assembly (DPS 016–028)
1
A
F
D
B
C
E
A
E
RETURN
AIR
SUPPLY
AIR
FRONT SIDE
RIGHT SIDE
BACK SIDE
LEFT SIDE
NOTE:
1. Check submittal drawing for gas/water/electrical/supply/return air opening
2. Horizontal above the roof gas connection only
3. All dimensions in inches
Standard Roof Curb – Large Cabinet
Roof Curb for ERW – Large Cabinet
Mechanical Installation
www.DaikinApplied.com
9
IM 1125-13 • REBEL ROOFTOPS