During Installation and subsequent maintenance
•
Installation and maintenance are to be performed only by qualified personnel who are familiar with
local codes and regulations, and experienced with this type of equipment.
•
If lifting equipment is required, ensure that it is suitable for purpose, certificated and that the operatives
are qualified to use it.
•
Safe working methods are identified and operatives have suitable PPE.
•
Ensure the working area has adequate ventilation during brazing procedures.
•
The units contain moving machinery and electrical power hazards, which may cause severe injury or
death. Disconnect and shut off power before installation or service of the equipment.
•
Refrigerant release into the atmosphere is illegal. Proper evacuation, recovery, handling and leak testing
procedures must be observed at all times.
•
Units must be earthed and no maintenance work should be attempted prior to disconnecting the
electrical supply.
•
The electrical covers and fan guards must remain fitted at all times.
•
Use of the units outside of the design conditions and the application for which the units were intended
may be unsafe and be detrimental to the units, regardless of short or long-term operation.
•
The units are not designed to withstand loads or stresses from other equipment or personnel. Such
extraneous loads or stress may cause failure/leak/injury.