background image

Fresh air intake kit - KDDP55D160-2

3

Fig.1 

Air outlet

Fig.2 

Both positions

Fig.3

Sealing material

Desiccant tape

Step 1
Peel off

the released paper.

Step 2
Adhere the sealing material
to the tape. (2 pcs.)

(12)

(12)

Air outlet

Indoor unit

Suction chamber

Indoor unit

Refrigerant piping

Control box lid

Sensor assembly

Hook
(4 positions)

Hanger bracket
(4 positions)

Fig.4 

Installation

Fig.5 

After installation

Hook

Suction chamber

Hook

Hook

Hanger bracket

Hanger bracket

How to fix the hooks

Align the contours

Indoor unit

Hanger bracket

Fig.6 

Installation completion figure

Suction chamber

Indoor unit

3. Installation of indoor unit and suction chamber

 

Install the indoor unit and suction chamber.
For installation, follow the installation manual provided with the indoor unit (Please 
refer to the right 

fi

 gure for the installation height.).

 

To install the suction chamber on an existing indoor unit, change the installation 
height of the indoor unit to A in the right 

fi

 gure.

Indoor unit

Hanger bracket

Suction chamber

Ceiling

Standard Decoration panel 

A

=185 mm

Designer Decoration panel 

A

=227 mm

4. Installation of connecting chamber and connection of 

fl

 exible duct

Install the connecting chambers. (One chamber on both sides, 2 in total) Fig.7.
1.  Push up the square holes of the connecting chamber (Left) or (Right) while 

fi

 tting them onto the hook (tab) of the suction chamber (2 positions).

2.  Fix the connecting chamber using the screws M5 provided. (2 positions).

Reviews: