![background image](http://html1.mh-extra.com/html/daikin/kddp55d160-2/kddp55d160-2_installation-manual_2460244004.webp)
Fresh air intake kit - KDDP55D160-2
3
Fig.1
Air outlet
Fig.2
Both positions
Fig.3
Sealing material
Desiccant tape
Step 1
Peel off
the released paper.
Step 2
Adhere the sealing material
to the tape. (2 pcs.)
(12)
(12)
Air outlet
Indoor unit
Suction chamber
Indoor unit
Refrigerant piping
Control box lid
Sensor assembly
Hook
(4 positions)
Hanger bracket
(4 positions)
Fig.4
Installation
Fig.5
After installation
Hook
Suction chamber
Hook
Hook
Hanger bracket
Hanger bracket
How to fix the hooks
Align the contours
Indoor unit
Hanger bracket
Fig.6
Installation completion figure
Suction chamber
Indoor unit
3. Installation of indoor unit and suction chamber
●
Install the indoor unit and suction chamber.
For installation, follow the installation manual provided with the indoor unit (Please
refer to the right
fi
gure for the installation height.).
●
To install the suction chamber on an existing indoor unit, change the installation
height of the indoor unit to A in the right
fi
gure.
Indoor unit
Hanger bracket
Suction chamber
Ceiling
Standard Decoration panel
A
=185 mm
Designer Decoration panel
A
=227 mm
4. Installation of connecting chamber and connection of
fl
exible duct
Install the connecting chambers. (One chamber on both sides, 2 in total) Fig.7.
1. Push up the square holes of the connecting chamber (Left) or (Right) while
fi
tting them onto the hook (tab) of the suction chamber (2 positions).
2. Fix the connecting chamber using the screws M5 provided. (2 positions).