![background image](http://html1.mh-extra.com/html/daikin/fxkq-mave-series/fxkq-mave-series_technical-data-manual_2459744018.webp)
• Indoor Units • CEILING MOUNTED CORNER CASSETTE • FXKQ-MAVE
• VRV
®
Systems • Indoor Units
16
11
Installation
11 - 1 Drainage instructions
When piping work is finished
•
Check if drainage flows smoothly. Open the inspection opening,
add approximately 1,000 cc of water slowly into the drain pan and
check drainage flow.
When electric wiring work is finished
•
Check drainage flow during COOL running, explained under “TEST
OPERATION”
When electric wiring work is not finished
•
Remove the electric parts box lid, connect power supply and
remote control to the terminals.
Next, press the inspection/test operation button
on the
remote control. The unit will engage the test operation mode.
Press the operation mode selector button
until selection
FAN OPERATION
. Then, press the ON/OFF button
.
The indoor unit fan and drain pump will start up. Check that the
water has drained from the unit. Press
to go back to the
first mode.
NOTE
1
Use the drain outlet for maintenance to drain water from the
drain pan.
Inspection opening
Portable pump
Bucket
Drain outlet for maintenance (with rubber plug)
CAUTION
1
Do not connect the drain piping directly to sewage pipes that
smell of ammonia. The ammonia in the sewage might enter the
indoor unit through the drain pipes and corrode the heat
exchanger.
Power supply
KV1 type 1 ~ 220-240V
PC board
Power supply terminal
Copper wire
Electric parts box lid.