b. Key points during inspection when handing over

3. SELECTING INSTALLATION SITE

[Notes]

4. PREPARATIONS BEFORE INSTALLATION

Electrical box

Over 300

Space for service 

and maintenance

Over 400

(Cases in with lower air 

return opening equipped)

Over 20

*H = over 240

Over 20

Inspection

opening

Ceiling

Over 2500

(Cases with  no ceiling)

Fig. 1

Floor

(Unit: mm)

200

Items of inspection

Inspected 

and signature

Was the user explained on the operating methods in 

accordance with the operation manual?
Was the operation manual handed over to the user?
Was the user instructed on the operating methods and cleaning 

methods of the parts supplied on site (air filter element and grille 

(suction inlet and air blow outlet), etc.)?
In case that there is operation manual for any part supplied on site, 

is the operation manual handed over to the user?

c. Key points on explanation of the operating methods

The sections with a      Warning and a      Caution 

symbol in the operation manual emphasize such 

issues as possible personal injury and damage to 

properties arising from failure to comply with the 

normal methods to use the air conditioner. The contents 

on the precautions shall be completely and clearly 

explained to the user, and the user shall be asked to 

read the operating section in this 

operation manual.

CAUTION

· 

When moving the air conditioner when it is being unpacked 

   or after it is unpacked, the hoisting bracket base shall be 

   held, but no force shall be applied on any other parts, 

   especially to the refrigerant pipe, water drainage pipe and 

   the flange parts.

· 

In case that the temperature and humidity in the lamination 

   in the ceiling are over 30

o

C and RH 80%, please apply 

   insulation material on the body of the unit.

   Please use glass wool or foamed polyethylene as the 

   insulation material, and the thickness shall be over 10 mm, 

   and it shall be able to be accommodated in the opening  

   in the ceiling.

(1) Select a place complying with all of the following 

     conditions and meeting the requirements of the 

     user to install the air conditioner.

    · 

Ensure that the ventilation is good.

    · 

The airflow is not blocked by any barrier.

    · 

The condensate can be smoothly drained off.

    · 

The strength of the ceiling can withstand the weight 

         of the indoor unit.

    · 

The ceiling is not obviously tilted.

    · 

There is no hazard of possible leakage of combustible gas. 

    · 

There is enough space for service and maintenance. 

         

(Please refer to Fig. 1)

    · 

The length of the pipe between the indoor unit and 

         the outdoor unit is within the allowable range. 

         (Please refer to the installation manual for the 

         outdoor unit.)

· 

The size of *H in the above figure stands for the 

   minimum height of the air conditioner.

· 

When selecting *H, the downward slope of at least 

   1/100 for the water drainage pipe shall be ensured, 

   as shown in Section 

“7. DRAIN PIPING WORK”

· 

To prevent image interference or noise, when installing 

   the indoor unit, outdoor unit, power cable and 

   transmission cable, they shall be at least 1 m from 

   the TV set or radio. (As the radio wave is different, 

   sometimes it cannot be ensured that interference can 

   be prevented even if the distance is 1 m.)

· 

In case that the wireless remote control assembly is 

   installed in houses with fluorescent light (variable 

   frequency or fast start type), possibly the signal 

   transmission distance of the remote control can become 

   shorter. The indoor unit shall be installed far from the 

   fluorescent light as possible.

(2) Use hanging bolt to install. Please check whether 

     the ceiling is firm enough to withstand the weight of 

     the indoor unit. In case that there is possibility that 

     the ceiling is not firm, please reinforce it in advance.

     (Please refer to the installation interval marked on the 

     packing carton to check whether reinforcement is required.)

(1) Please confirm the position relationship between 

     the unit and the hanging bolt. (Please refer to Fig. 2)

· 

Set the inspection opening on the side of the electrical 

   box to facilitate the maintenance and inspection of 

   the electrical box and the water drainage pump.

   In addition, set an inspection opening below the unit.

(Unit: mm)

Interval of the 

hoisting bolt

Air outlet

Air inlet

Interval of the hoisting bolt

Water 

drainage pump

Electrical box

Inspection opening

Ceiling

(Space for maintenance and repair)

450
315

A

B

450 x 450

Electrical box

Electrical box

300 Note 1

Section

Inspection opening

(Opening in the ceiling)

Fig. 2

450

450

A

A

Note

1. In case that the dimensions of the inspection opening 

    are less than 450 mm X 450 mm, please extend the 

    inspection opening towards the electrical box.

Summary of Contents for FXDQ-SPV1

Page 1: ...FXDQ SPV1 EDTFVN391825 201803 Engineering Data 50 Hz...

Page 2: ......

Page 3: ...ams 10 6 Electric Characteristics 11 7 Safety Devices Setting 12 8 Capacity Tables 13 8 1 Cooling Capacity for Te Auto 13 8 2 Cooling Capacity for Te 6 C 13 8 3 Cooling Capacity for Te 9 C 14 8 4 Heat...

Page 4: ...5 2 1 Lineup Capacity range 2 2 kW 2 8 kW 3 6 kW 4 5 kW 5 6 kW 7 1 kW 0 8 HP 1 HP 1 25 HP 1 6 HP 2 HP 2 5 HP Capacity index 20 25 31 25 40 50 62 5 FXDQ 20SPV1 25SPV1 32SPV1 40SPV1 50SPV1 63SPV1 V1 1 p...

Page 5: ...tion manual Drain hose Sealing pads Clamps Washers Insulation for fitting Metal clamp Washer fixing plate Screws for duct flanges Operation manual Installation manual Drain hose Sealing pads Clamps Wa...

Page 6: ...manual Drain hose Sealing pads Clamps Washers Insulation for fitting Metal clamp Washer fixing plate Screws for duct flanges Operation manual Installation manual Drain hose Sealing pads Clamps Washers...

Page 7: ...on manual Drain hose Sealing pads Clamps Washers Insulation for fitting Metal clamp Washer fixing plate Screws for duct flanges Operation manual Installation manual Drain hose Sealing pads Clamps Wash...

Page 8: ...FXDQ SPV1 EDTFVN391825 6 3 Dimensions FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 3D071829D Unit mm...

Page 9: ...FXDQ SPV1 EDTFVN391825 7 FXDQ40SPV1 FXDQ50SPV1 3D071831D Unit mm...

Page 10: ...FXDQ SPV1 EDTFVN391825 8 FXDQ63SPV1 3D071830D Unit mm...

Page 11: ...iagrams FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 FXDQ63SPV1 Refrigerant pipe connection port diameters Unit mm Model Gas Liquid FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 12...

Page 12: ...FXDQ SPV1 EDTFVN391825 10 5 Wiring Diagrams FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 FXDQ63SPV1 3D099151...

Page 13: ...FXDQ SPV1 EDTFVN391825 11 6 Electric Characteristics FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 FXDQ63SPV1 4D090515...

Page 14: ...50 V 5 A Fan motor thermal fuse C Fan motor thermal protector C OFF 130 5 ON 83 15 OFF 130 5 ON 83 15 OFF 130 5 ON 83 15 Model FXDQ40SPV1 FXDQ50SPV1 FXDQ63SPV1 Printed circuit board fuse A1P 250 V 5 A...

Page 15: ...gth Please confirm that the corrected capacity of the VRV system satisfies the required heat load 2 shows rated condition 8 2 Cooling Capacity for Te 6 C Model Capacity indication Indoor air temp 14 C...

Page 16: ...These capacity tables are for use when selecting a VRV indoor unit The actual capacity of the VRV system depends on factors such as the selected model of outdoor units outdoor air temperature and pip...

Page 17: ...FXDQ SPV1 EDTFVN391825 15 9 Fan Performances FXDQ20SPV1 3D072697C...

Page 18: ...FXDQ SPV1 EDTFVN391825 16 FXDQ25SPV1 3D072698C...

Page 19: ...FXDQ SPV1 EDTFVN391825 17 FXDQ32SPV1 3D090527...

Page 20: ...FXDQ SPV1 EDTFVN391825 18 FXDQ40SPV1 FXDQ50SPV1 3D072702C...

Page 21: ...FXDQ SPV1 EDTFVN391825 19 FXDQ63SPV1 3D090542...

Page 22: ...FXDQ SPV1 EDTFVN391825 20 10 Sound Levels FXDQ20SPV1 FXDQ25SPV1 4D090507A 4D090508A...

Page 23: ...FXDQ SPV1 EDTFVN391825 21 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 4D090509A 4D090510A...

Page 24: ...FXDQ SPV1 EDTFVN391825 22 FXDQ63SPV1 4D090511A...

Page 25: ...FXDQ SPV1 EDTFVN391825 23 11 Centre of Gravity FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 4D072718G Unit mm 4D072719G Unit mm...

Page 26: ...FXDQ SPV1 EDTFVN391825 24 FXDQ63SPV1 4D072720H Unit mm...

Page 27: ...s Item Model FXDQ20SPV1 FXDQ25SPV1 FXDQ32SPV1 FXDQ40SPV1 FXDQ50SPV1 FXDQ63SPV1 Remote controller Wireless Cooling Only BRC4C66 Heat Pump BRC4C65 Wired BRC1C62 Navigation remote controller Wired remote...

Page 28: ...ctrical shock or fire Use cables with the specified specifications and all the cables shall be reliably connected and the wiring terminals and the cables are not tensioned by any external force Poor w...

Page 29: ...ting methods of the various functions as well as the temperature adjustment methods of the air conditioner to the user and ask the user to read the operation manual and carry out operations at the sam...

Page 30: ...y drained off The strength of the ceiling can withstand the weight of the indoor unit The ceiling is not obviously tilted There is no hazard of possible leakage of combustible gas There is enough spac...

Page 31: ...an be built in the new ceiling and other items purchased in the market can be used Please refer to Fig 3 Fig 3 Top ceiling Pile anchor screw Long nut or screw thread device Hoisting bolt Note The leng...

Page 32: ...r air exchange 1 Connect the pipe Refrigerant has been filled in the outdoor unit Align the connecting section of the refrigerant pipe to the center of the flare section and firstly turn 3 4 operation...

Page 33: ...pipe of the air supply side The flare nut section The pipe supplied on site must be heat insulated to the connecting section of the pipe In case that the pipe is exposed condensate can occur and inju...

Page 34: ...ng band Water drainage hose 2 Large seal 5 Accessory Metal clip 1 Accessory 4mm Precautions on installing the water drainage riser pipe Case for Model FXDQ SPV1 Please confirm that the height of the w...

Page 35: ...e air conditioner Point 12 14 or 16 Use sealing materials such as aluminum adhesive tape to seal the connection section between the flange and the air pipe on the air inlet side so as to prevent air l...

Page 36: ...is within a place easily in contact with people please install an electricity leakage circuit breaker to prevent electrical shock 4 When an electricity leakage circuit breaker is used please use a dev...

Page 37: ...ng cable to the electrical box When connecting the cables the cables shall be routed orderly and placed even and the electrical box cover shall not be supported up and the electrical box cover shall b...

Page 38: ...auses as loosened cables When connected to the terminal board please use round wiring terminal with insulated sleeve In case that round wiring terminal with insulated sleeve cannot be used connect the...

Page 39: ...Electrical Wiring Work 3 Remove the electrical box cover 4 Connect remote control 2 Slave to the terminal board of the remote control cable in the electrical box P1 and P2 No polarity 1 P 2 P 1 F 2 F...

Page 40: ...Setting the time to display the clean air filter element signal To change the Setting for contamination level of the air filter element tell the following contents to the user The factory setting to d...

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ...rts and accessories supplied or specified by Daikin Ask a qualified installer or contractor to install those parts and accessories Use of unauthorised parts and accessories or improper installation of...

Reviews: