![background image](http://html1.mh-extra.com/html/daikin/ftxp50m2v1b/ftxp50m2v1b_installers-reference-manual_3331440027.webp)
6
|
Installation
Installer reference guide
27
FTXP50~7 FTXF20~7 ATXF50~71A2V1B
Daikin room air conditioner
4P513661-8H – 2019.12
3
Insert a wall cover into the wall pipe.
Ø65
a b
c
a
Wall embedded pipe
b
Putty
c
Wall hole cover
4
After completing wiring, refrigerant piping and drain piping, do NOT forget to
seal the gap with putty.
6.3.4 To remove the pipe port cover
To connect the piping on right-side, right-bottom, left-side or left-bottom, the pipe
port cover MUST be removed.
1
Cut off the pipe port cover from inside the front grille using a coping saw.
2
Remove any burrs along the cut section using a half round needle file.
NOTICE
Do NOT use nippers to remove the pipe port cover, as this would damage the front
grille.
6.3.5 To provide drainage
Make sure condensation water can be evacuated properly. This involves:
▪
General guidelines
▪
Connecting the drain piping to the indoor unit
▪
Checking for water leaks
General guidelines
▪
Pipe length.
Keep drain piping as short as possible.
▪
Pipe size.
If drain hose extension or embedded drain piping is required, use
appropriate parts that match the hose front end.
Summary of Contents for FTXP50M2V1B
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ...4P513661 8H 2019 12 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...