background image

8 Disposal

Installation manual

12

(A)(F)TXP20~3 FTXF20~3 FTXF20~25B5V1B

Daikin room air conditioner

3P519299-1H – 2019.09

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

7.2.1

To perform a test run in winter season

When operating the air conditioner in 

Cooling

 mode in winter, set it

to test run operation using the following method.

For FTXP and ATXP units

1

Press 

, and 

 simultaneously.

2

Press 

.

3

Select 

.

4

Press 

.

5

Press 

 to switch the system on.

Result: 

Test  run  operation  will  stop  automatically  after  about

30 minutes.

6

To stop operation, press 

.

For FTXF units

7

Press  to switch the system on.

8

Press the centre of 

, and 

 simultaneously.

9

Press 

 twice.

Result: 

  will  appear  on  the  display.  Test  run  operation  is

selected.  Test  run  operation  will  stop  automatically  after  about
30 minutes.

10

To stop operation, press .

INFORMATION

Some  of  the  functions  CANNOT  be  used  in  the  test  run
operation mode.

If  a  power  failure  occurs  during  operation,  the  system  automatically
restarts immediately after power is restored.

8

Disposal

Dismantling of the unit and treatment of the refrigerant, oil and other
parts MUST comply with the applicable legislation.

Summary of Contents for FTXP35L5V1B

Page 1: ...l Daikin room air conditioner English Installation manual Daikin room air conditioner FTXP20L5V1B FTXP25L5V1B FTXP35L5V1B ATXP20L5V1B ATXP25L5V1B ATXP35L5V1B FTXF20A5V1B FTXF25A5V1B FTXF35A5V1B FTXF20...

Page 2: ...atitinka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad ja lietoti atbilsto i ra ot ja nor d jumiem atbilst sekojo iem standartiem un...

Page 3: ...odytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad ja lietoti atbilsto i ra ot ja nor d jumiem atbilst sekojo iem standartiem un citiem normat vie...

Page 4: ...na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartus ir arba kitus normi...

Page 5: ...ep it for future reference Target audience Authorised installers INFORMATION This appliance is intended to be used by expert or trained users in shops in light industry and on farms or for commercial...

Page 6: ...horic acid deoxidised seamless copper for refrigerant Foreign materials inside pipes including oils for fabrication must be 30 mg 10 m Refrigerant piping diameter Use the same diameters as the connect...

Page 7: ...s 20 35 back on the front grille 3 Install the air filter and then mount the front panel To remove the electrical wiring box cover 1 Remove the front grille 2 Remove 1 screw from the electrical wiring...

Page 8: ...Bore a 65 mm large feed through hole in the wall with a downward slope towards the outside 2 Insert a wall embedded pipe into the hole 3 Insert a wall cover into the wall pipe 65 a b c a Wall embedde...

Page 9: ...arly qualified persons in order to avoid a hazard WARNING Do NOT connect the power supply to the indoor unit This could result in electrical shock or fire WARNING Do NOT use locally purchased electric...

Page 10: ...ory f Bottom frame 5 5 2 To pass the pipes through the wall hole 1 Shape the refrigerant pipes along the pipe path marking on the mounting plate a b c c d e a Drain hose b Caulk this hole with putty o...

Page 11: ...tallation of the unit first check the items listed below Once all checks are fulfilled the unit must be closed Power up the unit after it is closed You read the complete installation instructions as d...

Page 12: ...ng the air conditioner in Cooling mode in winter set it to test run operation using the following method For FTXP and ATXP units 1 Press and simultaneously 2 Press 3 Select 4 Press 5 Press to switch t...

Page 13: ...DS DIP SWITCH E H HEATER F U FU FOR CHARACTERISTICS FUSE REFER TO PCB INSIDE YOUR UNIT FG CONNECTOR FRAME GROUND H HARNESS H P LED V L PILOT LAMP LIGHT EMITTING DIODE HAP LIGHT EMITTING DIODE SERVICE...

Page 14: ......

Page 15: ......

Page 16: ...TEMLER SAN T C A STANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P519299 1H 2...

Reviews: