![background image](http://html1.mh-extra.com/html/daikin/ftxp20l2v1b/ftxp20l2v1b_installers-reference-manual_3323748011.webp)
6 Installation
Installer reference guide
11
(A)(F)TXP20~3 FTXF20~71A2V1B
Daikin room air conditioner
4P513661-1 – 2017.10
2
Remove 1 screw from the electrical wiring box.
3
Open the electrical wiring box cover by pulling the protruding
part on the top of the cover.
4
Unhook the tab on the bottom and remove the electrical wiring
box cover.
a
a
c
b
a
1
3
2
a
Tab
b
Protruding part on the top of the cover
c
Screw
5
To re-install the cover, first hook the bottom tab onto the
electrical wiring box, and slide the cover into the 2 upper tabs.
To open the service lid
1
Remove 1 screw from the service lid.
2
Pull out the service lid horizontally away from the unit.
a
b
a
Service lid screw
b
Service lid
6.2.3
To install the mounting plate
1
Install the mounting plate temporarily.
2
Level the mounting plate.
3
Finish the installation by securing the mounting plate on the wall
using screws.
4
Use a tape measure. Position the end of tape measure at
symbol " ".
INFORMATION
The removed pipe port cover can be kept in the mounting
plate pocket.
337
770
A
A
285
44.5
170
48
48
44.5
116.5
117
337
50
213
237
170
a
h
a
a
g
a
a
d
c
b
c
e
a
f
990
295
170
60
170
44
.5
44
.5
122
121.5
56.5
56.5
404
475
PIPING HOLE
CENTER:170mm
TO THE LEFT
PIPING HOLE
CENTER:170mm
TO THE LEFT
a
a
a
b
c
c
h
g
a
e
d
a
f
A
B
(mm)
337
770
A
A
285
44.5
170
48
48
44.5
116.5
117
337
50
213
237
170
a
h
a
a
g
a
a
d
c
b
c
e
a
f
990
295
170
60
170
44
.5
44
.5
122
121.5
56.5
56.5
404
475
PIPING HOLE
CENTER:170mm
TO THE LEFT
PIPING HOLE
CENTER:170mm
TO THE LEFT
a
a
a
b
c
c
h
g
a
e
d
a
f
A
B
(mm)
(mm)
A
Class 20~35
B
Class 50~71
a
Recommended mounting plate fixing spots
b
Pocket for the pipe port cover
c
Tabs for placing a spirit level
d
Through-the-wall hole Ø 65 mm
e
Drain hose position
f
Position for the tape measure at symbol " "
g
Gas pipe end