background image

10 Commissioning

Installation manual

10

CTXA-C(W)(B)(S) + FTXA-C(W)(B)(S)

Daikin room air conditioner

3P697375-6B – 2023.05

10

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during commissioning and
hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

10.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

The 

outdoor unit

 is properly mounted.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

There are NO 

missing phases

 or 

reversed phases

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The indoor unit receives the signals of the 

user interface

.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

10.2

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

10.2.1

To perform a test run using the wireless
remote control

1

Press 

 to switch the system on.

2

Press 

 and 

 simultaneously.

3

Press 

, select 

and press 

.

Result: 

Test  run  operation  will  stop  automatically  after  about

30 minutes.

4

To stop operation sooner, press 

.

11

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

12

Technical data

▪ A 

subset

  of  the  latest  technical  data  is  available  on  the  regional

Daikin website (publicly accessible).

▪ The 

full  set

  of  latest  technical  data  is  available  on  the  Daikin

Business Portal (authentication required).

12.1

Wiring diagram

The  wiring  diagram  is  delivered  with  the  unit,  located  on  the
inner right side of the indoor unit front grille.

12.1.1

Unified wiring diagram legend

For applied parts and numbering, refer to the wiring diagram on the
unit.  Part  numbering  is  by  Arabic  numbers  in  ascending  order  for
each part and is represented in the overview below by "*" in the part
code.

Symbol

Meaning

Symbol Meaning

Circuit breaker

Protective earth

Connection

Protective earth (screw)

Summary of Contents for FTXA25C2V1BW

Page 1: ...manual Daikin room air conditioner CTXA15C2V1BW FTXA20C2V1BW FTXA25C2V1BW FTXA35C2V1BW FTXA42C2V1BW FTXA50C2V1BW CTXA15C2V1BS FTXA20C2V1BS FTXA25C2V1BS FTXA35C2V1BS FTXA42C2V1BS FTXA50C2V1BS CTXA15C2V...

Page 2: ...less remote control 10 11 Disposal 10 12 Technical data 10 12 1 Wiring diagram 10 12 1 1 Unified wiring diagram legend 10 1 About the documentation 1 1 About this document WARNING Make sure installati...

Page 3: ...cured on site and all electrical construction MUST comply with the applicable legislation WARNING If the power supply has a missing or wrong N phase equipment might break down Establish proper earthin...

Page 4: ...E g persons using cardiac pacemakers or defibrillators This product may cause electromagnetic interference Auto control equipment E g automatic doors or fire alarm equipment This product may cause fa...

Page 5: ...h h b e c a a a a a a a Recommended mounting plate fixing spots h Hole for embedded piping 65 mm b Pocket for the pipe port cover i Value for tape measure c Liquid pipe end j Position for tape measure...

Page 6: ...n left side left back or left bottom INFORMATION The factory default is right side piping For left side piping remove the piping from the right side and install it on the left side 1 Remove the insula...

Page 7: ...MILDLY FLAMMABLE MATERIAL The refrigerant inside this unit is mildly flammable Pipe length Keep refrigerant piping as short as possible 1 Connect refrigerant piping to the unit using flare connection...

Page 8: ...distance between both wirings should ALWAYS be at least 50 mm Electrical work should be carried out in accordance with the installation manual and the national electrical wiring rules or code of prac...

Page 9: ...along the pipe path marking on the mounting plate c c d e a b a Drain hose b Caulk this hole with putty or caulking material c Adhesive vinyl tape d Insulation tape e Mounting plate accessory NOTICE D...

Page 10: ...ide of the indoor and outdoor units There are NO refrigerant leaks The correct pipe size is installed and the pipes are properly insulated The stop valves gas and liquid on the outdoor unit are fully...

Page 11: ...R KCR KFR KHuR K M Magnetic relay L Live L Coil L R Reactor M Stepper motor M C Compressor motor M F Fan motor M P Drain pump motor M S Swing motor MR MRCW MRM MRN Magnetic relay N Neutral n N Number...

Page 12: ...3P697375 6B 2023 05 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...

Reviews: