![background image](http://html1.mh-extra.com/html/daikin/ftk09nmvju/ftk09nmvju_service-manual_3263258011.webp)
Si041552E
PCBs / Swing Motor
Removal Procedure
9
5. PCBs / Swing Motor
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the control PCB.
When reassembling, fit the
projection at the back of the
terminal board into the hole
on the mounting plate.
1
Remove the screw of
the terminal board.
2
Release the earth /
ground wires and the
thermistor harness from
the slit.
3
Release the terminal
board harness from the
groove and the 3
hooks.
Terminal board
(R21839)
Mounting plate
Projection
(R21840)
Slit
Thermistor harness
Earth /
ground
wire
(R21841)
Hook
Groove
Terminal board harness
(R21842)