OVERALL CHECKING
Ensure the following, in particular:-
1. The unit is mounted solidly and rigid in position.
2. Piping and connections are leak proof after charging.
3. Proper wiring has been done (see fig below).
Drainage check:- Pour some water into left side of drain
pan (drainage are in right side of unit).
• Test run:
1. Conduct a test run after water drainage test and gas
leakage test.
FI ELD WIRE
FI ELD WIRE
0
[@]
E==3
o
G
0
0
C
0
tl
O
[@]
0
[@]
□
1
7
2. Watch out for the following:-
a)
Is the electric plug firmly inserted into the
socket?
b)
Is there any abnormal sound from unit?
c)
Is there smooth drainage of water?
• Check that:
1. Condenser fan is running, with warm air blowing off
the condensing unit.
2. Evaporator blower is running and discharge cool air.
3. The remote controller incorporates a 3 minute delay
in the circuit. Thus, it requires about 3 minutes before
the outdoor condensing unit can start up.