Installation manual
9
FCQ35~14 FCQH71~140C7VEB
Split System air conditioners
4PW31577-1B
5
Press Inspection/Test Operation button
4 times
(2 times for wireless remote controller) and operate at Test
Operation mode for 3 minutes.
6
Push air flow direction adjust button
to make sure
the unit is in operation.
7
Press Inspection/Test Operation button
and operate
normally.
8
Confirm function of unit according to the operation manual.
Test operation before installing decoration panel (See
"Notes" on
page 10
)
1
Open the gas side stop valve.
2
Open the liquid side stop valve.
3
Electrify crank case heater for 6 hours.
4
Set to cooling operation with the wired remote controller and
start operation by pushing ON/OFF button.
5
Press Inspection/Test Operation button
4 times and
operate at Test Operation mode for 3 minutes.
6
Press Inspection/Test Operation button
and operate
normally.
7
Confirm function of unit according to the operation manual.
8
Turn off the main power supply after operation.
Precautions
1
In case something is wrong with the unit and it does not operate,
refer to the installation manual attached to the outdoor unit or
contact your dealer.
2
Refer to the installation manual attached to the outdoor unit in
case of Individual Operation System type.
3
Conduct test operation after installing decoration panel if the
wireless remote controller is used.
N
OTES
NOTE
Do not touch the drain pump, this may cause electrical
shock.
/TEST
SWING
/TEST
/TEST
/TEST