![background image](http://html1.mh-extra.com/html/daikin/fca125av16/fca125av16_installation-and-operational-manual_4704678053.webp)
0
4-2. UNIT PACKING
)
0
ll
• Cover the unit with polythene product
cover, then pick the unit up and settle it
down on the bottom skid(e) as shown
in figure.
• Put the top corrugated cardboard
sheet and EPS (c) on the top of the
unit as shown in figure.
a)
b)
c)
d)
e)
f)
Strap
Starp Cutter
Top corrugated
cardboard sheet with
EPS
Cardboard Box
Bottom Skid
Portable strap fixing
machine
•
Reference for placing strap
a.
• Put the cardboard box (d) upon the
unit as shown in figure .
• Fix the straps (a) on the unit with help of strap
fixing machine (f) as shown in figure.(Use
marked reference for placing straps)