![background image](http://html1.mh-extra.com/html/daikin/fca125av16/fca125av16_installation-and-operational-manual_4704678008.webp)
4. PREPARATIONS BEFORE INSTALLATION
(1) Relation of ceiling opening to unit and suspension bolt position.
-1-
:::::::-,. cii
Q) C:
::c·,---1+-++¥
Refrigerant
piping
� -� - _g
a_ CL:!:
CL
0 C: -
c::: O)=,_g
0 C: ....
� ==
g -�
._
Q)
"C
en
o � E �
0
C)
-
CL
a>
,....
o cn
O m-..t�
-
I co
-
0
C)
�
ll) c.o
r--
0) co
I
s
.
- 1 -- uspensIon
71 O(Suspenslon bolt pitch)
1
1
-
840 (Indoor unit)
860 - 91 0 Ceili enin I
950 (Decoration panel)j
f'A
Fig. 4
bolt
(x4)
(unit: mm)
False
ceiling
View as seen from
A
Fig. 5
Hanger
bracket
()
Decoration Panel
C (mm)
125~130
■
Use the installation guide (15) (delivered with the unit) for exact vertical positioning of the unit.
Apply the short side of the cut-out section
in case of standard grille.
7
.
Installation guide (15)
'
(accessory)
l?.iZi!:
Underside
of the unit_
BYCQ125EAF
6/
EA
K
BYCQ125EAF
6/
EA
K
Summary of Contents for FCA125AV16
Page 68: ...MEMO 3P727715 5 B...