CAUTION
•
Refer to “2. Items to be checked at time of delivery to customer” on page 4 upon completion of the test oper-
ation and make sure that all the items are checked.
•
If the customer’s interior work is not finished on completion of the test operation, tell the customer not to
operate the air conditioner.
Substances generated from paints and adhesives used for the interior work may contaminate the product
if the unit is operated.
When delivering the product to the customer after the test operation is completed, check that the control
box lid, the air filter and the suction grille are mounted. In addition, explain to the customer regarding the
state (ON/OFF) of the power supply breaker.
12. WIRING DIAGRAM
(Refer to Fig. 34)
1
TO OUTDOOR UNIT
2
(NOTE 10)
3
(NOTE 4)
4
IN CASE OF SIMULTANEOUS
OPERATION SYSTEM
5
(NOTE 6)
6
INDOOR UNIT (MASTER)
7
INDOOR UNIT (SLAVE)
8
REMOTE CONTROLLER
9
(NOTE 8)
10
WIRELESS REMOTE
CONTROLLER (RECEIVER/
DISPLAY UNIT) (OPTIONAL
ACCESSORY)
11
INPUT FROM OUTSIDE
12
TRANSMISSION WIRING
CENTRAL REMOTE
CONTROLLER
13
(NOTE 5)
14
WIRED REMOTE CONTROLLER
(OPTIONAL ACCESSORY)
15
(NOTE 7)
16
FRONT
17
SIDE
18
CONTROL BOX
To test operation Contractors