Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

NOTICE

The unit contains a manual air purge valve. Make sure it is
closed. Only open it when performing an air purge.

If the field piping contains any automatic air purge valves,
make sure they are open, also after commissioning.

INFORMATION

Protective  functions  –  "Installer-on-site  mode"

.  The

software  is  equipped  with  protective  functions,  such  as
room antifrost. The unit automatically runs these functions
when necessary.

During  installation  or  service  this  behaviour  is  undesired.
Therefore, the protective functions can be disabled:

At  first  power-on:

  The  protective  functions  are

disabled by default. After 12 h they will be automatically
enabled.

Afterwards:

  An  installer  can  manually  disable  the

protective  functions  by  setting  [9.G]: 

Disable

protections

=

Yes

.  After  his  work  is  done,  he  can

enable  the  protective  functions  by  setting  [9.G]:

Disable protections

=

No

.

9.1

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

outdoor unit

 is properly mounted.

Field wiring

Be  sure  that  the  field  wiring  has  been  carried  out
according  to  the  instructions  described  in  the  chapter

"6  Electrical  installation" 

[

4

  13],  according  to  the  wiring

diagrams and according to the applicable legislation.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the outdoor unit.

Only if the external backup heater kit is installed:

Backup  heater  circuit  breaker

  F1B  (factory-mounted  in

the backup heater kit) is turned ON.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

There are no 

water leaks

 inside the outdoor unit.

The 

shut-off valves

 are properly installed and fully open.

The 

manual air purge valve

 is closed.

The 

pressure  relief  valve

  purges  water  when  opened.

Clean water must come out.

The 

minimum  water  volume

  is  guaranteed  in  all

conditions. See "To check the water volume and flow rate"
in 

"5.1 Preparing water piping" 

[

4

 10].

9.2

Checklist during commissioning

The 

minimum  flow  rate

  is  guaranteed  in  all  conditions.

See  "To  check  the  water  volume  and  flow  rate"  in

"5.1 Preparing water piping" 

[

4

 10].

To perform an 

air purge

.

To perform a 

test run

.

To perform an 

actuator test run

.

Underfloor screed dryout function

The  underfloor  screed  dryout  function  is  started  (if
necessary).

9.2.1

To check the minimum flow rate

1

Check the hydraulic configuration to find out which
space heating loops can be closed by mechanical,
electronic, or other valves.

2

Close all space heating loops that can be closed.

3

Start the pump test run (see 

"9.2.4 To perform an

actuator test run" 

[

4

 34]).

4

Read out the flow rate

(a)

 and modify the bypass valve

setting to reach the minimum required flow rate + 2 l/
min.

(a)

During pump test run, the unit can operate below the minimum
required flow rate.

If operation is…

Then the minimum required

flow rate is…

Cooling

20 l/min

Heating/defrost when outdoor
temperature is above –5°C

Heating/defrost when outdoor
temperature is below –5°C

22 l/min

9.2.2

To perform an air purge

Conditions: 

Make  sure  all  operation  is  disabled.  Go  to  [C]:

Operation

  and  turn  off 

Room

  and 

Space  heating/cooling

operation.

Summary of Contents for EWAA Series

Page 1: ...t pumps English https daikintechnicaldatahub eu Installation manual Packaged air cooled water chillers and packaged air to water heat pumps EWAA011 016DAV3P EWAA011 016DAW1P EWAA011 016DAV3P H EWAA011...

Page 2: ...n side No top side obstacle Suction side obstacle No top side obstacle Discharge side obstacle No top side obstacle Suction discharge side obstacle Top side obstacle Suction discharge side obstacle Wa...

Page 3: ...ngen van siguiendo las disposiciones de secondo le prescrizioni per de acordo com o previsto em 10 11 12 13 14 15 16 17 18 under iagttagelse af bestemmelserne i enligt villkoren i gitt i henhold til b...

Page 4: ...staava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS...

Page 5: ...n wizard Language 26 8 2 2 Configuration wizard Time and date 26 8 2 3 Configuration wizard System 26 8 2 4 Configuration wizard Backup heater 27 8 2 5 Configuration wizard Main zone 27 8 2 6 Configur...

Page 6: ...lated room without continuously operating ignition sources example open flames an operating gas appliance or an operating electric heater WARNING Make sure installation servicing maintenance and repai...

Page 7: ...MUST be in accordance with the instructions from this manual See 9 Commissioning 433 3 About the box 3 1 Outdoor unit 3 1 1 To remove the accessories from the outdoor unit NOTICE Unpacking Top packagi...

Page 8: ...cturer Be aware that R32 refrigerant does NOT contain an odour WARNING The appliance shall be stored so as to prevent mechanical damage and in a well ventilated room without continuously operating ign...

Page 9: ...414 349 214 111 480 490 107 148 B B B 406 C D F E A Discharge side B Distance between anchor points C Bottom frame D Knockout hole for snow E Drain hole for safety valve F Drain holes Snow In regions...

Page 10: ...ume Check that the total water volume in the installation is higher than the minimum water volume the internal water volume of the outdoor unit NOT included If Then the minimum water volume is Cooling...

Page 11: ...n This shut off valve and drain point are field supplied NOTICE Install air purge valves at all local high points 5 2 2 To fill the water circuit To fill the water circuit use a field supply filling k...

Page 12: ...eezing the glycol will prevent the liquid inside the piping from freezing NOTICE The required concentration might differ depending on the type of glycol ALWAYS compare the requirements from the table...

Page 13: ...X5M 0 88 10 X9M 2 45 10 X10M 0 88 10 6 3 Connections to the outdoor unit Item Description Power supply main See 6 3 2 To connect the main power supply 414 User interface See 6 3 3 To connect the user...

Page 14: ...er See 4 3 1 To open the outdoor unit 49 2 Insert the cables at the back of the unit and route them through the unit to the appropriate terminal blocks b c a d a High voltage options b Low voltage opt...

Page 15: ...r See 4 3 1 To open the outdoor unit 49 2 Connect the preferential kWh rate power supply 1N or 3N depending on model see name plate N L N PE Q1DI X1M L X1M L1 X1M L2 X1M L3 X1M N X1M N X1M X1M L3 L2 L...

Page 16: ...25 mm Maximum length 200 m 2 9 Control 1 6 Room sensor offset 1 Open the service cover See 4 3 1 To open the outdoor unit 49 2 Connect the user interface cable to the outdoor unit Fix the cable with...

Page 17: ...t is installed proceed as follows 1 Remove the WLAN cartridge and USB memory stick if any 2 Push the rear plate on each of the 4 spots where the snap fits are located 6 3 4 To connect the shut off val...

Page 18: ...or unit 49 2 Connect the alarm output cable to the appropriate terminals as shown in the illustration below 7 9 YC Y1 X2M 1 2 3 A4P 1 2 Wires connected to the alarm output 3 Wire between X2M and A4P A...

Page 19: ...s to the cable tie mountings 6 3 9 To connect the power consumption digital inputs Wires 2 per input signal 0 75 mm Power limitation digital inputs 12 V DC 12 mA detection voltage supplied by PCB 9 9...

Page 20: ...8 8 Limit setting kw The wiring of the Smart Grid in case of low voltage contacts is as follows 14 13 S11S 6 5 S4S 4 3 X5M S10S 10 9 a a Jumper factory mounted If you also connect a safety thermostat...

Page 21: ...l backup heater kit For reversible models you can install the external backup heater kit EKLBUHCB6W1 If you do so then under certain conditions you also need to install a bypass valve kit EKMBHBP1 See...

Page 22: ...l Standard setting the limits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase 1 Connect the backup heater power supply A...

Page 23: ...X15M F1B LV HV 2 On the outdoor unit connect the HV cable to the appropriate terminals as shown in the illustration below 6 7 8 9 10 X15M X3M 1 X3M 2 X3M 3 X3M 4 X3M 5 EKLBUHCB6W HV 1 2 3 4 5 X3M 3 On...

Page 24: ...h cable ties to the cable tie mountings 7 Finishing the outdoor unit installation 7 1 To check the insulation resistance of the compressor NOTICE If after installation refrigerant accumulates in the c...

Page 25: ...ton in the home screen For example 2 9 Accessing settings via the code in the overview field settings Code For example C 07 See also To access the installer settings 425 8 5 Menu structure Overview in...

Page 26: ...cy is set to Automatic and a heat pump failure occurs the backup heater automatically takes over the heat load When Emergency is set to Manual and a heat pump failure occurs the space heating stops To...

Page 27: ...ll a flow switch EKFLSW1 8 2 4 Configuration wizard Backup heater INFORMATION Restriction Backup heater settings are only applicable in case the optional external backup heater kit is installed The ba...

Page 28: ...nt e g fan coil units Room thermostat Unit operation is decided based on the ambient temperature of the dedicated Human Comfort Interface BRC1HHDA used as room thermostat Code Description 2 9 C 07 0 L...

Page 29: ...offset curve Which type of curve you use to make adjustments depends on your personal preference See 8 3 4 Using weather dependent curves 430 Availability The weather dependent curve is available for...

Page 30: ...oint mode WD heating fixed cooling OR Weather dependent Additional zone Cooling 3 4 Additional zone Setpoint mode Weather dependent To change the type of weather dependent curve To change the type for...

Page 31: ...type for the main zone 1 1 contact The used external room thermostat can only send a thermo ON OFF condition There is no separation between heating or cooling demand 2 2 contacts The used external ro...

Page 32: ...s 9 9 Power consumption control Power consumption control Type Limit Limit 1 Limit 2 Limit 3 Limit 4 Priority heater BBR16 activation BBR16 power limit 9 Installer settings Configuration wizard Backup...

Page 33: ...to the wiring diagrams and according to the applicable legislation The system is properly earthed and the earth terminals are tightened The fuses or locally installed protection devices are installed...

Page 34: ...est run starts It stops automatically when ready 30 min To stop the test run manually 1 In the menu go to Stop test run 2 Select OK to confirm Possible actuator test runs Backup heater 1 test Backup h...

Page 35: ...water chillers and packaged air to water heat pumps 4P620240 1 2020 06 Explain the user how to properly operate the system and what to do in case of problems Show the user what to do for the maintena...

Page 36: ...Low pressure switch b Water OUT screw connection male 1 S1NPH Pressure sensor c Drain valve water circuit Y1E Electronic expansion valve main d Plate heat exchanger Y3E Electronic expansion valve inje...

Page 37: ...for normal power supply standard Only for preferential kWh rate power supply outdoor Only for preferential kWh rate power supply outdoor Outdoor Outdoor SWB1 Hydro switch box 1 front side SWB2 Hydro s...

Page 38: ...voltage supplied by PCB Space C H On OFF output Space cooling heating ON OFF output SWB Hydro switch box 1 front side 6 Options 6 Options English Translation Continuous Continuous current DHW pump out...

Page 39: ...2 core signal 2 core signal 2 core signal 2 core Flow switch signal 2 core 2 core 2 core 5 core R2T External sensor floor or ambient Only for KRTETS WLAN cartridge signal 2 core 3m included A14P P1 P2...

Page 40: ...4P620240 1 2020 06 Copyright 2020 Daikin 4P620240 1 0000000C Verantwortung f r Energie und Umwelt...

Reviews: