9
|
Electrical installation
Installer reference guide
113
EPRA14~W1 + ET9W
Daikin Altherma 3 H HT F
4P644739-1 – 2021.02
f
Smart Grid pulse meter
1
Install the components of the Smart Grid relay kit as follows:
a
b
c
d
e
K1A
K2A
X10M
×2
×4
K1A, K2A
Relays
X10M
Terminal block
a
Screws for X10M
b
Screws for K1A and K2A
c
Sticker to put on the high voltage wires
d
Wires between the relays and X5M (AWG22 ORG)
e
Wires between the relays and X10M (AWG18 RED)
B
A
B
X5M
5 6 9 10
1 2 3 4
K1A
K2A
b
b
X10M
a
2
Connect the low voltage wiring as follows:
A
X5M.4
X5M.3
S4S
B
A
B
X5M
3 4
1314
3
Connect the high voltage wiring as follows: